Let the speeds (work done per day) of X, Y, and Z be $S_X$, $S_Y$, and $S_Z$, respectively. The total work is considered as 1 unit.
$S_X = S_Y + S_Z \quad (1)$
$S_X + S_Y = 3S_Z \quad (2)$
$S_X + S_Y + S_Z = \frac{1}{15} \quad (3)$
We can solve the system of equations to find the speed of Z ($S_Z$).
$(S_Y + S_Z) + S_Y = 3S_Z$
$2S_Y + S_Z = 3S_Z$
$2S_Y = 2S_Z$
$S_Y = S_Z$
$S_X = S_Z + S_Z$
$S_X = 2S_Z$
$(2S_Z) + S_Z + S_Z = \frac{1}{15}$
$4S_Z = \frac{1}{15}$
$S_Z = \frac{1}{4 \times 15}$
$S_Z = \frac{1}{60}$
The speed of Z ($S_Z$) is $\frac{1}{60}$ of the task per day. The time Z takes to finish the task alone is the reciprocal of its speed.
Time for Z = $\frac{1}{S_Z} = \frac{1}{1/60}$
Time for Z = 60 days.
Mohan can do a piece of work in 10 days and Sohan in 15 days. They started working together, but after 3 days Mohan left the work . What time will Sohan take to finish the work?
A tank is filled in 8 hours by three taps A, B and C. The tap C is thrice as fast as B and B is twice as fast as A. How much time will pipe B alone take to fill the tank?
Had been one menless, then the number of days required to do a piece of work would have been one more. If the number of Man. Days required to complete the work is 56, how many workers were there?
A can do a piece of work in 16 hours, B and C can do it in 8 hours while A and C can do it 12 hours. How long will B alone take to do it?