All Exams Test series for 1 year @ ₹349 only
Question

To do a certain work, A and B work on alternate days, with B beginning the work on the first day. A can finish the work alone in 48 days. If the work gets completed in \(11\frac{1}{3}\) days, then B alone can finish 4 times the same work in:

This question was previously asked in
SSC CGL 2018 (Tier 2) Statistics Previous Year Paper (22-feb-2018)
The correct answer is

27 days

Understanding the Work and Time Problem

This problem involves two individuals, A and B, working on alternate days to complete a task. We are given the time A takes to finish the work alone and the total time taken when A and B work on alternate days, with B starting the work. We need to find the time B takes to complete four times the same work alone.

Calculating Individual Work Rates

The work rate of a person is the amount of work they can do in one day. If a person can complete a work in \(d\) days, their daily work rate is \(1/d\) of the total work.

  • A can finish the work alone in 48 days.
  • Therefore, A's daily work rate = \(\frac{1}{48}\) of the work per day.

Let B's daily work rate be \(r_B\). This means B can complete \(r_B\) fraction of the work per day.

Analyzing Work Done on Alternate Days

A and B work on alternate days, and B starts the work. The total time taken to complete the work is \(11\frac{1}{3}\) days. Let's analyze which person works on which day:

  • Day 1: B works
  • Day 2: A works
  • Day 3: B works
  • Day 4: A works
  • ... and so on.

The total time is \(11\frac{1}{3}\) days, which means the work is completed during the 12th day. Since B starts, the odd-numbered days (1, 3, 5, ..., 11) are B's working days, and the even-numbered days (2, 4, 6, ..., 10) are A's working days. On day 12, it would be A's turn to work.

Let's count the number of full days worked by A and B within the 11 full days:

  • B works on Day 1, 3, 5, 7, 9, 11. Total full days B worked = 6 days.
  • A works on Day 2, 4, 6, 8, 10. Total full days A worked = 5 days.

The work is completed in \(11\frac{1}{3}\) days. This means after 11 full days, \(\frac{1}{3}\) of a day's work is needed on the 12th day. Day 12 is A's turn. So, A works for \(\frac{1}{3}\) of the 12th day.

Total time A worked = 5 full days + \(\frac{1}{3}\) day = \(5\frac{1}{3}\) days = \(\frac{16}{3}\) days.

Total time B worked = 6 full days = 6 days.

Setting up the Work Equation

The total work done is the sum of the work done by A and the work done by B. The total work is 1 (representing one complete work).

  • Work done by A = A's daily rate \(\times\) Number of days A worked = \(\frac{1}{48} \times \frac{16}{3}\).
  • Work done by B = B's daily rate \(\times\) Number of days B worked = \(r_B \times 6\).

The equation for the total work done is:

Work done by A + Work done by B = 1

\(\left(\frac{1}{48} \times \frac{16}{3}\right) + \left(r_B \times 6\right) = 1\)

Solving for B's Work Rate

Let's simplify the equation and solve for \(r_B\):

\(\frac{16}{48 \times 3} + 6 r_B = 1\)

\(\frac{16}{144} + 6 r_B = 1\)

Simplify the fraction:

\(\frac{1}{9} + 6 r_B = 1\)

Subtract \(\frac{1}{9}\) from both sides:

\(6 r_B = 1 - \frac{1}{9}\)

\(6 r_B = \frac{9 - 1}{9}\)

\(6 r_B = \frac{8}{9}\)

Divide by 6 to find \(r_B\):

\(r_B = \frac{8}{9 \times 6}\)

\(r_B = \frac{8}{54}\)

Simplify the fraction for \(r_B\):

\(r_B = \frac{4}{27}\)

So, B's daily work rate is \(\frac{4}{27}\) of the work per day.

Calculating Time for B to Finish the Work Alone

If B's daily work rate is \(\frac{4}{27}\) of the work, the time B takes to finish the entire work (1 whole work) alone is the reciprocal of the daily rate:

Time for B alone = \(\frac{1}{r_B} = \frac{1}{\frac{4}{27}} = \frac{27}{4}\) days.

Calculating Time for B to Finish 4 Times the Work

The question asks for the time B alone can finish 4 times the same work. If B takes \(\frac{27}{4}\) days for 1 work, for 4 times the work, it will take:

Time for 4 times the work = \(4 \times \text{Time for 1 work}\)

Time for 4 times the work = \(4 \times \frac{27}{4}\)

Time for 4 times the work = \(27\) days.

Conclusion

B alone can finish 4 times the same work in 27 days.

Item Value
A's time for 1 work 48 days
A's daily work rate \(\frac{1}{48}\)
Total time taken (alternate days) \(11\frac{1}{3}\) days
Days A worked \(5\frac{1}{3}\) or \(\frac{16}{3}\) days
Days B worked 6 days
B's daily work rate (\(r_B\)) \(\frac{4}{27}\)
B's time for 1 work \(\frac{27}{4}\) days
B's time for 4 times the work 27 days

Revision Table: Key Concepts for Work and Time Problems

Concept Explanation Formula/Idea
Work Rate The amount of work done per unit of time (usually a day). If time taken is T days, rate = \(\frac{1}{T}\) work/day
Total Work Typically represented as '1' for one complete task. Work = Rate \(\times\) Time
Combined Work Rate Sum of individual work rates when working together. \(R_{A+B} = R_A + R_B\)
Alternate Days Work People work one after another, not simultaneously. Calculate work done in cycles or count individual days worked. Total Work = Sum of (Individual Rate \(\times\) Days Worked by Individual)

Additional Information: Solving Alternate Day Work Problems

Alternate day work problems require careful counting of the days each person works. When the total time is not a whole number, pay close attention to whose turn it is on the fractional part of the day.

Steps for solving alternate day problems:

  1. Calculate the individual daily work rates.
  2. Determine the sequence of work (who starts?).
  3. Count the exact number of days (or fractions of days) each person worked based on the total time given.
  4. Set up an equation: (Work done by Person 1) + (Work done by Person 2) + ... = 1 (or the specified amount of work).
  5. Solve the equation for the unknown variable (usually a work rate or time).
  6. Use the calculated work rate/time to answer the specific question posed.

In this problem, carefully identifying that A worked for \(5\frac{1}{3}\) days and B worked for 6 days was crucial because B started and the work finished during A's turn on the 12th day.

Was this answer helpful?

Similar Questions

  1. Five men and 2 boys can do in 30 days as much work as 7 men and 10 boys can do in 15 days. How many boys should join 40 men to do the same work in 4 days?

  2. To do a certain work, A and B work on alternate days with B beginning the work on the first day. A alone can complete the same work in 24 days. If the work gets completed in  \(11 \frac{1}{3}\)  days, then B alone can complete  \(\rm \frac{7}{9}^{th}\)  part of the original work in:

  3. R, S and T can finish a work in 20, 15 and 10 days, respectively. R works on all days and S and T work on alternate days with T starting the work on the first day. In how many days is the work finished?

  4. A can do \(1 \over 3\) of a piece of work in 32 days, B can do \(37{1 \over 2}\)% of the same work in 24 days, while C can do 60% of the same work in 48 days. B and C together started and worked for x days. After x days, B left the work and A joined C and both completed the remaining work in (x + 8) days. If the ratio of the work done by (B + C) together to the work done by (A + C) together is 9 ∶ 11, then what fraction of the same work can be completed by C alone in 3.5x days?

  5. A group of college students had decided to complete a project in 10 days. As 2 students dropped out every day, the project got completed at the end of the 15th day. The number of students at the beginning of the project was:

  6. A group of men decided to do a job in 13 days but 9 men left the work after each day. The work, as a result, got completed in 16 days. How many men were initially in the group?

  7. Working alone A can do a work in 72 days and B in 90 days. If they work on it together for 10 days, then what fraction of work is left?

  8. Three men and 4 women can do a piece of work in 7 days, whereas 2 men and 1 woman can do it in 14 days. Seven women will complete the same work in:

  9. Five men can complete a work in 20 days. Ten women can complete the same work in 15 days. Two men and six women started working together. After 5 days, three women left the work a new man joined the work. The group continued working together till the end of the work. In how many days will they be able to do the remaining work?

  10. 4 men and 5 women can complete a work in 15 days, whereas 9 men and 6 women can do it in 10 days. To complete the same work in 7 days, how many women should assist 4 men?


Important Questions from Work Efficiency

  1. Five men and 2 boys can do in 30 days as much work as 7 men and 10 boys can do in 15 days. How many boys should join 40 men to do the same work in 4 days?

  2. A man completes 7/8 of a job in 21 days. How many more days will it take him to finish the job if quantum of work further increased by 50%?

  3. 24 men and 12 women can do a piece of work in 30 days. In how many days can 12 men and 24 women do the same piece of work?

  4. A and B together can do a piece of work in 4 days, B and C can do it in 6 days, A and C can do it in 8 days. Then A, B and C together can do the same work in :-

  5. A can complete 50% of a work in 9 days and B can do 25% of the work in 9 days, if they work alone. If they work together then how much work (in percentage) can be completed in 6 days?

Need Expert Advice?
Upcoming Exams
UPSSSC PET
October 25, 2026
SSC JE
November 02, 2026
SSC CPO
November 20, 2026
SSC CHSL
November 30, 2026
Test Series
SSC CGL img
SSC
SSC CGL (Tier I + Tier II) 2026 Mock Test Series - Latest Pattern
2503 Tests 6 Tests Free
7846 Attempts
4.2(905)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App