36
To solve this problem, we can use the concept of man-hours, a common technique in work and time problems. This approach calculates the total hours required to complete a job based on the number of workers and hours worked per day.
First, determine the volume of the wall that 12 men can build.
Next, find out the total man-hours required to build the wall, given the current team configuration:
To build this wall, 960 man-hours are required. Now, calculate the volume of the new wall:
The ratio of volumes gives us the ratio of man-hours needed:
Thus, the man-hours required for the new wall is:
Now calculate how many days 16 men working 10 hours a day will take to complete this:
Thus, the correct answer is: 36 days.
A can lay railway track between two given stations in 17 days and B can do the same job in 16 days. With the help of C, they did the job in 4 days only. Then, C alone can do the job in __________