36
To solve this problem, we can use the concept of man-hours, a common technique in work and time problems. This approach calculates the total hours required to complete a job based on the number of workers and hours worked per day.
First, determine the volume of the wall that 12 men can build.
Next, find out the total man-hours required to build the wall, given the current team configuration:
To build this wall, 960 man-hours are required. Now, calculate the volume of the new wall:
The ratio of volumes gives us the ratio of man-hours needed:
Thus, the man-hours required for the new wall is:
Now calculate how many days 16 men working 10 hours a day will take to complete this:
Thus, the correct answer is: 36 days.
A person can complete 20% of work in 8 days and another person y can complete 25% of the same work in 6 days. If they work together, in how many days will 40% of the work be completed?
P works thrice as fast as Q, whereas P and Q together can work four times as fast as R. If P, Q and R together work on a job, in what ratio should they share the earnings?
There are three pillars X, Y and Z of different heights. Three spiders A, B and C start to climb on these pillars simultaneously. In one chance, A climbs on X by 6 cm but slips down 1 cm. B climbs on Y by 7 cm but slips down 3 cm. C climbs on Z by 6.5 cm but slips down 2 cm. If each of them requires 40 chances to reach the top of the pillars, what is the height of the shortest pillar?
There is an order of 19000 quantity of a particular product from a customer. The firm produces 1000 quantity of that product per out of which 5% are unfit for sale. In how many days will the order be completed?
Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire job alone?