Aditya is twice as good a workman as Bipin and therefore can finish a job in 30 days less than Bipin. How many days are required to complete the job if working together?
20 days
"Twice as good a workman" means Aditya works at double Bipin's rate, so he needs half the time. If Bipin takes \(b\) days, Aditya takes \(\dfrac{b}{2}\) days.
Aditya finishes 30 days sooner, so the time difference is \(b - \dfrac{b}{2} = 30\).
This gives \(\dfrac{b}{2} = 30\), so \(b = 60\) days for Bipin and \(\dfrac{60}{2} = 30\) days for Aditya.
Convert to one-day work (rate = 1 ÷ time): Bipin does \(\dfrac{1}{60}\) and Aditya does \(\dfrac{1}{30}\) of the job per day.
Working together, combined one-day work \(= \dfrac{1}{60} + \dfrac{1}{30} = \dfrac{1 + 2}{60} = \dfrac{3}{60} = \dfrac{1}{20}\).
Time together = reciprocal of the combined rate \(= \dfrac{1}{\,1/20\,} = 20\) days.
Key concept: efficiency and time are inversely proportional, and rates add when people work together. Hence together they finish the job in 20 days.
P and Q working alone can complete a work in 9 days and 18 days respectively. They work on alternate days one at a time. P works on the first day. In how many days the whole work will be completed?
A can do a job in 10 days and B in 12 days. They work on alternate days starting with A. In how many days will the job be finished?
Given ,6 men and 8 boys can complete the task in 10 days, and 26 men and 48 boys can finish it in just 2 days, how long will it take for 15 men and 20 boys to do the same work?
A and B together do a piece of work in 10 days. B alone does it in 15 days. How long will A take alone?
A does 60% of the work in 18 days. He then calls in B, and they together finish the remaining work in 4 days. How long would B alone take to do the whole work?
A can complete a work in 8 days, while B can do it in 16 days. How many days will they take together?
If 8 men can do a piece of work in 14 days, the time taken by 12 men to do the same piece of work will be:
A construction project was estimated to be completed in 180 days. Due to rain, only 60% of the days were productive. If the work done each productive day is constant, by what percent must daily output be increased to complete the project on time?
A can complete the work in 12 days, B in 15 days, and C in 20 days.
They work in the following manner:
• On the first day A works,
• On the second day, B works,
• On the third day, C works, The cycle repeats in the same order.
In how many days will the work be completed?
Amit can finish the work in 15 days, and Baban can finish the same work in 25 days. They work together for 5 days. The rest of the work was finished by Amit and Chetan in 4 days. How much time is required for Chetan to finish this work?