Given ,6 men and 8 boys can complete the task in 10 days, and 26 men and 48 boys can finish it in just 2 days, how long will it take for 15 men and 20 boys to do the same work?
4 days
Let one man's one-day work be \(m\) and one boy's one-day work be \(b\).
The total work is the same both times: \((6m+8b)\times 10 = (26m+48b)\times 2\).
This gives \(60m+80b = 52m+96b\), so \(8m = 16b\) and \(m = 2b\).
Express the work in boy-units: \(6m+8b = 6(2b)+8b = 20b\).
So total work \(= 20b\times 10 = 200b\) boy-days.
The new group does \(15m+20b = 15(2b)+20b = 50b\) per day.
Time required \(= \dfrac{200b}{50b} = 4\) days.
15 men and 20 boys will take 4 days.
P and Q working alone can complete a work in 9 days and 18 days respectively. They work on alternate days one at a time. P works on the first day. In how many days the whole work will be completed?
P, Q and R working alone can complete a work in 24, 30 and 40 days respectively. All three of them started the work together but after 8 days P left the work. Q left the work 6 days before the work was completed. R completed the remaining work alone. In how many days was the total work completed?
A does 60% of the work in 18 days. He then calls in B, and they together finish the remaining work in 4 days. How long would B alone take to do the whole work?
If 8 men can do a piece of work in 14 days, the time taken by 12 men to do the same piece of work will be:
A and B together can do a job in 6 days. A alone does it in 9 days. In how many days can B alone do it?
A can do a job in 10 days and B in 12 days. They work on alternate days starting with A. In how many days will the job be finished?
Aditya is twice as good a workman as Bipin and therefore can finish a job in 30 days less than Bipin. How many days are required to complete the job if working together?
A can do a piece of work in 20 days and B in 30 days. They work together for 5 days. How much work is left?
A alone can do a work in 20 days, B alone in 30 days. They work together for 6 days, then A leaves. How many more days will B take to finish the remaining work?
A can do a work in 18 days, B in 27 days. They start together, but after 6 days A leaves. In how many more days will B finish the remaining work?
Mohan can do a piece of work in 10 days and Sohan in 15 days. They started working together, but after 3 days Mohan left the work . What time will Sohan take to finish the work?
A tank is filled in 8 hours by three taps A, B and C. The tap C is thrice as fast as B and B is twice as fast as A. How much time will pipe B alone take to fill the tank?
Had been one menless, then the number of days required to do a piece of work would have been one more. If the number of Man. Days required to complete the work is 56, how many workers were there?
A can do a piece of work in 16 hours, B and C can do it in 8 hours while A and C can do it 12 hours. How long will B alone take to do it?