P and Q working alone can complete a work in 9 days and 18 days respectively. They work on alternate days one at a time. P works on the first day. In how many days the whole work will be completed?
12
Take total work as the LCM of the two times so the daily rates are whole numbers: \(\text{LCM}(9,18) = 18\) units.
P finishes in 9 days, so P's rate \(= \dfrac{18}{9} = 2\) units/day; Q finishes in 18 days, so Q's rate \(= \dfrac{18}{18} = 1\) unit/day.
They alternate starting with P, so one full 2-day cycle (P then Q) does \(2 + 1 = 3\) units.
After 5 cycles = 10 days, work done \(= 5 \times 3 = 15\) units, leaving \(18 - 15 = 3\) units.
Day 11 is P's turn: \(15 + 2 = 17\) units. Day 12 is Q's turn: \(17 + 1 = 18\) units — the work is exactly complete.
Key idea: fix a convenient total, group alternate days into cycles, then finish the remainder day by day. The whole work is completed in 12 days.
Aditya is twice as good a workman as Bipin and therefore can finish a job in 30 days less than Bipin. How many days are required to complete the job if working together?
A can do a job in 10 days and B in 12 days. They work on alternate days starting with A. In how many days will the job be finished?
Given ,6 men and 8 boys can complete the task in 10 days, and 26 men and 48 boys can finish it in just 2 days, how long will it take for 15 men and 20 boys to do the same work?
A and B together do a piece of work in 10 days. B alone does it in 15 days. How long will A take alone?
A does 60% of the work in 18 days. He then calls in B, and they together finish the remaining work in 4 days. How long would B alone take to do the whole work?
A can do a work in 15 days, B in 30 days. They start together but A leaves after 5 days. In how many more days will B complete the remaining work?
A can complete a work in 8 days, while B can do it in 16 days. How many days will they take together?
If 8 men can do a piece of work in 14 days, the time taken by 12 men to do the same piece of work will be:
A construction project was estimated to be completed in 180 days. Due to rain, only 60% of the days were productive. If the work done each productive day is constant, by what percent must daily output be increased to complete the project on time?
10 men can complete a piece of work in 8 days. How many men are required to complete the same work in 5 days?