A can do a job in 10 days and B in 12 days. They work on alternate days starting with A. In how many days will the job be finished?
\(10\frac{5}{6}\) days
In alternate-day work we track how much of the job is done in each two-day cycle, then handle the leftover on the next turn.
A finishes the job in 10 days, so A does \(\dfrac{1}{10}\) per day; B finishes in 12 days, so B does \(\dfrac{1}{12}\) per day.
One cycle is A on day 1 and B on day 2, together \(\dfrac{1}{10} + \dfrac{1}{12} = \dfrac{6+5}{60} = \dfrac{11}{60}\) of the work.
After 5 full cycles (10 days) the work done is \(5\times \dfrac{11}{60} = \dfrac{55}{60}\).
The work still left is \(1 - \dfrac{55}{60} = \dfrac{5}{60} = \dfrac{1}{12}\).
Day 11 is A's turn again, and A's rate is \(\dfrac{1}{10}\) per day, so the time to clear the remainder is \(\dfrac{1/12}{1/10} = \dfrac{10}{12} = \dfrac{5}{6}\) day.
Adding this to the 10 days already spent gives \(10 + \dfrac{5}{6} = 10\tfrac{5}{6}\) days.
The job is finished in 10 5/6 days.
P and Q working alone can complete a work in 9 days and 18 days respectively. They work on alternate days one at a time. P works on the first day. In how many days the whole work will be completed?
Aditya is twice as good a workman as Bipin and therefore can finish a job in 30 days less than Bipin. How many days are required to complete the job if working together?
Given ,6 men and 8 boys can complete the task in 10 days, and 26 men and 48 boys can finish it in just 2 days, how long will it take for 15 men and 20 boys to do the same work?
A and B together do a piece of work in 10 days. B alone does it in 15 days. How long will A take alone?
A does 60% of the work in 18 days. He then calls in B, and they together finish the remaining work in 4 days. How long would B alone take to do the whole work?
A can complete a work in 8 days, while B can do it in 16 days. How many days will they take together?
If 8 men can do a piece of work in 14 days, the time taken by 12 men to do the same piece of work will be:
A construction project was estimated to be completed in 180 days. Due to rain, only 60% of the days were productive. If the work done each productive day is constant, by what percent must daily output be increased to complete the project on time?
A can complete the work in 12 days, B in 15 days, and C in 20 days.
They work in the following manner:
• On the first day A works,
• On the second day, B works,
• On the third day, C works, The cycle repeats in the same order.
In how many days will the work be completed?
Amit can finish the work in 15 days, and Baban can finish the same work in 25 days. They work together for 5 days. The rest of the work was finished by Amit and Chetan in 4 days. How much time is required for Chetan to finish this work?