Question

A and B together can do a piece of work in 10 days. If A can do the work in 15 days, find in how many days that B alone can do the same work. Given below are the steps involved in solving the above problem. Arrange them in sequential order.

(A) One day’s work of B is 1/10 - 1/15

(B) One day’s work of A and B is 1/10 and one day’s work of A is 1/15

(C) B alone can do the work in 30 days

(D) One day’s work of B is 1/30

This question was previously asked in
RRB ALP/Technician 2018 CBT 2 Electronics Mechanic Question Paper (23-Jan-2019) (Shift 1)
The correct answer is

BADC

Understanding the Time and Work Problem

This question asks us to determine the number of days it takes for person B to complete a piece of work alone, given the time A and B take together and the time A takes alone. We are provided with steps to solve this problem and need to arrange them in the correct logical sequence.

In time and work problems, the amount of work done is inversely proportional to the time taken. If someone completes a work in 'n' days, their one day's work is $ \frac{1}{n} $. Conversely, if someone's one day's work is $ \frac{1}{n} $, they complete the work in 'n' days.

Step-by-Step Solution for Finding B's Work Time

Let's analyze the given steps and place them in the correct order to solve the problem:

  1. We start by expressing the work done by A and B together, and by A alone, in terms of their one day's work. The problem states that A and B together do the work in 10 days, and A alone does it in 15 days.
    • One day's work of A and B together $ = \frac{1}{10} $.
    • One day's work of A alone $ = \frac{1}{15} $.
    This corresponds to step (B).
  2. Next, to find B's one day's work, we subtract A's one day's work from the combined one day's work of A and B.
    • One day's work of B $ = $ (One day's work of A and B) $ - $ (One day's work of A)
    • One day's work of B $ = \frac{1}{10} - \frac{1}{15} $
    This corresponds to step (A).
  3. Now, we calculate the value of B's one day's work:
    • One day's work of B $ = \frac{1}{10} - \frac{1}{15} $
    • To subtract fractions, find a common denominator, which is 30.
    • $ \frac{1}{10} = \frac{1 \times 3}{10 \times 3} = \frac{3}{30} $
    • $ \frac{1}{15} = \frac{1 \times 2}{15 \times 2} = \frac{2}{30} $
    • One day's work of B $ = \frac{3}{30} - \frac{2}{30} = \frac{3-2}{30} = \frac{1}{30} $
    This result, stating that B's one day's work is $ \frac{1}{30} $, corresponds to step (D).
  4. Finally, since B's one day's work is $ \frac{1}{30} $, B can complete the entire work in the reciprocal of their one day's work.
    • Time taken by B alone $ = \frac{1}{\text{One day's work of B}} = \frac{1}{\frac{1}{30}} = 30 $ days.
    This conclusion, stating that B alone can do the work in 30 days, corresponds to step (C).

Therefore, the correct sequential order of the steps is (B), (A), (D), (C).

Arranging the Steps in Sequential Order

Based on our analysis, the correct sequence of the given steps is:

  1. One day’s work of A and B is $ \frac{1}{10} $ and one day’s work of A is $ \frac{1}{15} $.
  2. One day’s work of B is $ \frac{1}{10} - \frac{1}{15} $.
  3. One day’s work of B is $ \frac{1}{30} $.
  4. B alone can do the work in 30 days.

This gives us the order BADC.

Step Description Logical Action
B One day’s work of A and B is $ \frac{1}{10} $ and one day’s work of A is $ \frac{1}{15} $ Initial Setup
A One day’s work of B is $ \frac{1}{10} - \frac{1}{15} $ Calculate B's one day's work
D One day’s work of B is $ \frac{1}{30} $ Result of B's one day's work calculation
C B alone can do the work in 30 days Final Answer (convert one day's work to total days)

Revision Table: Key Concepts in Time and Work

Concept Explanation Formula/Relation
Work Rate The amount of work done per unit of time (e.g., per day). Work Rate $ = \frac{1}{\text{Time Taken}} $
Total Work Considered as 1 unit or a specific quantifiable amount. Usually represented as '1' for the whole work.
Combined Work Rate Sum of individual work rates when people work together. If A's rate is $ R_A $ and B's rate is $ R_B $, combined rate is $ R_A + R_B $.
Time Taken (from Rate) The reciprocal of the work rate. Time Taken $ = \frac{1}{\text{Work Rate}} $

Additional Information: Solving Time and Work Problems

Time and work problems often involve calculating the efficiency or rate at which individuals or groups complete a task. The core idea is to standardize the work done over a common unit of time, typically one day or one hour.

  • When individuals work together, their work rates add up. For instance, if person 1 completes a job in $ T_1 $ days and person 2 in $ T_2 $ days, their combined one day's work is $ \frac{1}{T_1} + \frac{1}{T_2} $. They would complete the work together in $ \frac{1}{\frac{1}{T_1} + \frac{1}{T_2}} $ days.
  • If the work rate of a group is given, and one member's rate is known, the other member's rate can be found by subtraction, as shown in this problem.
  • Always ensure that the time units are consistent (e.g., all in days or all in hours).

This problem is a classic example of finding an individual's work rate when the combined rate and another individual's rate are known. By correctly sequencing the steps, we efficiently move from given information to the final answer.

Was this answer helpful?

Similar Questions

  1. 4 workers working 6 hours per day can finish painting a wall in 21 days. If 7 workers work for 4 hours per day, in how many days will they be able to finish the same work?

  2. A and B can complete a task together in 35 days. If A works alone and completes \(\frac{5}{7}\) of the task and then leaves the rest for B to complete by herself, it will take a total of 90 days to complete the task. How many days would it take A, the more efficient among the duo, to complete the entire work by herself?

  3. A and B can complete a piece of work in 10 days and 15 days respectively. B starts the work and is joined by A after 5 days. If they earn a total of Rs. 60, what are their individual shares?

  4. A pump can fill a tank in 4 hours, but due to a leak, the tank now gets filled in 5 hours. How long will it take the leakage to empty the tank when it is full?

  5. Mugdha and Mayuri, working together, can complete a job in 18 days. However, Mayuri works alone and leaves after completing two-fifths of the job and then Mugdha takes over and completes the remaining work by herself. As a result, the duo could complete the job in 39 days. How many days would Mugdha alone have taken to do the job if Mayuri worked faster than Mugdha?

  6. Pramod can paint a wall red in 12 hours while Brajen can paint the wall red completely in 16 hours. If Pramod and Brajen work alternately for an hour each stalling when the wall has just cement on it till when it is completely painted red, how many hours will it take to paint the entire wall red?

  7. Arjun and Anurag complete a job in 5 days and 6 days respectively. They worked together and earned a total of Rs. 770. Find Arjun’s share in this amount (in Rs.).

  8. A and B can complete a task in 10 days, B and C can complete it in 15 days while C and A can do the same task together in 12 days. How many days will they together take to complete the task?

  9. 10 people could complete a task in 8 days. After 4 days, 2 of the workers left. How many days from then did it take to complete the remaining task?

  10. Sharan and Mayukh, working together, can complete a task in 18 days. However, Mayukh works alone and leaves after completing one-third of the task. Then, Sharan takes over and completes the remaining work by himself. As a result, the duo could complete the task in 40 days. How many days would Sharan alone have taken to do the job if Mayukh had worked faster than Sharan?


Important Questions from Work Efficiency

  1. M is thrice as efficient as workman as N and therefore is able to finish a job in 264 days less than N. Then in how many days can N finish the entire work?
  2. A can do a piece of work in $1455$ days. B is $25\%$ more efficient than A. Find the number of days taken by B to do the same piece of work.
  3. 45 people take 18 days to dig a pond. If the pond would have to be dug in 15 days, then the number of people to be employed will be
  4. A stock of food is enough for 240 men for 48 days. How long will the same stock last for 160 men?
  5. One contractor had undertaken a construction work. To complete the given job, he sought labour comprising 24 men for 12 days for working 10 hours a day. But due to festival season, as the labour had gone to their respective hometowns, he could get only 15 men and they too were willing to work 8 hours a day. With this much labour, in how many days would he be able to complete the same job?

Need Expert Advice?
Upcoming Exams
RRB Staff Nurse
November 23, 2026
RRB Paramedical
November 23, 2026
Test Series
RRB ALP img
Railways
RRB ALP 2026 Mock Test series
1035 Tests 1 Tests Free
1802 Attempts
4.3(260)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App