All Exams Test series for 1 year @ ₹349 only
Question

A and B can complete a task together in 35 days. If A works alone and completes \(\frac{5}{7}\) of the task and then leaves the rest for B to complete by herself, it will take a total of 90 days to complete the task. How many days would it take A, the more efficient among the duo, to complete the entire work by herself?

This question was previously asked in
RRB ALP/Technician 2018 CBT 2 Electronics Mechanic Question Paper (23-Jan-2019) (Shift 1)
The correct answer is

42

Solving Work and Time Problems: Finding Individual Efficiency

This problem involves understanding the concepts of work rate and how individual and combined efforts contribute to completing a task over time. We are given information about how long A and B take together, and how long a specific sequence of their individual work takes in total. We need to find the time taken by the more efficient person, A, to complete the entire task alone.

Understanding the Given Information

  • A and B together complete the task in 35 days.
  • If A works alone for \(\frac{5}{7}\) of the task and then B works alone for the remaining \(\frac{2}{7}\) of the task, the total time taken is 90 days.
  • A is more efficient than B.

Setting up the Problem with Variables

Let's define variables to represent the work rate (efficiency) of A and B.

  • Let the rate of work of A be \(r_A\) (amount of work per day).
  • Let the rate of work of B be \(r_B\) (amount of work per day).
  • Let the total amount of work required to complete the task be \(W\) units.

The time taken by a person to complete the work alone is the total work divided by their work rate. So:

  • Time taken by A alone = \(\frac{W}{r_A}\) days.
  • Time taken by B alone = \(\frac{W}{r_B}\) days.

Formulating Equations from the Given Conditions

Condition 1: A and B together complete the task in 35 days.

When working together, their rates add up. Their combined rate is \(r_A + r_B\). The total work \(W\) is completed in 35 days at this combined rate.

So, \(W = (r_A + r_B) \times 35\) days.

Condition 2: A does \(\frac{5}{7}\) of the task alone, then B does the remaining \(\frac{2}{7}\) alone. Total time is 90 days.

Time taken by A to complete \(\frac{5}{7}W\) work = \(\frac{\frac{5}{7}W}{r_A} = \frac{5W}{7r_A}\) days.

Time taken by B to complete \(\frac{2}{7}W\) work = \(\frac{\frac{2}{7}W}{r_B} = \frac{2W}{7r_B}\) days.

The total time for this sequence is 90 days:

\(\frac{5W}{7r_A} + \frac{2W}{7r_B} = 90\)

Solving the Equations

We have two equations:

  1. \(W = 35(r_A + r_B)\)
  2. \(\frac{5W}{7r_A} + \frac{2W}{7r_B} = 90\)

Substitute the expression for \(W\) from Equation 1 into Equation 2:

\(\frac{5 \times 35(r_A + r_B)}{7r_A} + \frac{2 \times 35(r_A + r_B)}{7r_B} = 90\)

Simplify the terms:

\(\frac{5 \times 5 (r_A + r_B)}{r_A} + \frac{2 \times 5 (r_A + r_B)}{r_B} = 90\)

\(25 \left(\frac{r_A + r_B}{r_A}\right) + 10 \left(\frac{r_A + r_B}{r_B}\right) = 90\)

Separate the terms inside the parentheses:

\(25 \left(\frac{r_A}{r_A} + \frac{r_B}{r_A}\right) + 10 \left(\frac{r_A}{r_B} + \frac{r_B}{r_B}\right) = 90\)

\(25 \left(1 + \frac{r_B}{r_A}\right) + 10 \left(\frac{r_A}{r_B} + 1\right) = 90\)

Let \(x = \frac{r_A}{r_B}\). Then \(\frac{r_B}{r_A} = \frac{1}{x}\). Substitute this into the equation:

\(25 \left(1 + \frac{1}{x}\right) + 10 (x + 1) = 90\)

\(25 + \frac{25}{x} + 10x + 10 = 90\)

\(35 + 10x + \frac{25}{x} = 90\)

Move all terms to one side:

\(10x + \frac{25}{x} - 55 = 0\)

Multiply the entire equation by \(x\) to eliminate the fraction (assuming \(x \neq 0\)):

\(10x^2 + 25 - 55x = 0\)

Rearrange into a standard quadratic form \(ax^2 + bx + c = 0\):

\(10x^2 - 55x + 25 = 0\)

Divide by 5 to simplify:

\(2x^2 - 11x + 5 = 0\)

Now, solve this quadratic equation for \(x\) using factoring or the quadratic formula.

Factoring: We need two numbers that multiply to \(2 \times 5 = 10\) and add up to -11. These numbers are -1 and -10.

\(2x^2 - 10x - x + 5 = 0\)

\(2x(x - 5) - 1(x - 5) = 0\)

\((2x - 1)(x - 5) = 0\)

This gives two possible values for \(x\):

  • \(2x - 1 = 0 \implies 2x = 1 \implies x = \frac{1}{2}\)
  • \(x - 5 = 0 \implies x = 5\)

Recall that \(x = \frac{r_A}{r_B}\). The problem states that A is more efficient than B, which means A has a higher work rate: \(r_A > r_B\). Therefore, the ratio \(\frac{r_A}{r_B}\) must be greater than 1.

Comparing the two possible values of \(x\):

  • \(x = \frac{1}{2} = 0.5\) (This means \(r_A/r_B = 0.5\), so \(r_A = 0.5 r_B\), meaning B is more efficient - contradicts the problem statement).
  • \(x = 5\) (This means \(r_A/r_B = 5\), so \(r_A = 5 r_B\), meaning A is 5 times more efficient than B - consistent with the problem statement).

So, we must have \(x = 5\), which means \(r_A = 5r_B\).

Calculating the Time for A Alone

We want to find the time A takes to complete the work alone, which is \(\frac{W}{r_A}\).

From Equation 1, we have \(W = 35(r_A + r_B)\).

Substitute \(r_A = 5r_B\) into this equation:

\(W = 35(5r_B + r_B)\)

\(W = 35(6r_B)\)

\(W = 210r_B\)

Now we can calculate \(\frac{W}{r_A}\). Since \(r_A = 5r_B\), we can also write \(r_B = \frac{r_A}{5}\). Substitute this into the expression for \(W\):

\(W = 210 \left(\frac{r_A}{5}\right)\)

\(W = 42r_A\)

Rearrange to find the time for A alone:

\(\frac{W}{r_A} = 42\)

So, it would take A 42 days to complete the entire work by herself.

Verification

If A takes 42 days, \(r_A = W/42\). Since \(r_A = 5r_B\), \(W/42 = 5r_B\), so \(r_B = W/(42 \times 5) = W/210\). B takes 210 days.

  • Together time: \(W / (r_A + r_B) = W / (W/42 + W/210) = W / (5W/210 + W/210) = W / (6W/210) = 210/6 = 35\) days. (Matches Condition 1)
  • Partial work time: Time for A to do \(\frac{5}{7}W = \frac{5/7 W}{r_A} = \frac{5/7 W}{W/42} = \frac{5}{7} \times 42 = 5 \times 6 = 30\) days.
  • Time for B to do \(\frac{2}{7}W = \frac{2/7 W}{r_B} = \frac{2/7 W}{W/210} = \frac{2}{7} \times 210 = 2 \times 30 = 60\) days.
  • Total time for partial work = 30 + 60 = 90 days. (Matches Condition 2)

The results match both conditions, and A (42 days) is more efficient than B (210 days). The answer is consistent.

Concept Formula Application in Problem
Work Rate Rate = Work / Time \(r_A = W / T_A\), \(r_B = W / T_B\)
Combined Rate \(r_A + r_B\) \(W = (r_A + r_B) \times 35\)
Time for Partial Work Time = Partial Work / Rate Time for A = \(\frac{5/7 W}{r_A}\), Time for B = \(\frac{2/7 W}{r_B}\)

Conclusion

Based on the calculations, it would take A, the more efficient worker, 42 days to complete the entire task alone.

Revision Table: Work and Time Concepts

Concept Description Key takeaway
Individual Work Rate Amount of work a person does per unit of time (e.g., per day). Higher rate means less time to complete work.
Combined Work Rate Sum of individual work rates when people work together. Combined rate allows work to be done faster (less time).
Total Work The total amount of task to be completed. Can be assumed as 1 unit or represented by a variable like W. Usually represents the total job, regardless of how many people do it.
Time Taken Total work divided by the work rate. Time = Work / Rate

Additional Information: Work and Time Problem Strategies

Work and time problems often require setting up algebraic equations based on the relationship between work, rate, and time (\(\text{Work} = \text{Rate} \times \text{Time}\)). Here are some common strategies:

  • Assume Total Work: You can assume the total work to be a convenient number, often the Least Common Multiple (LCM) of the given time periods. This helps avoid fractions when calculating rates, although using a variable \(W\) works just as well, as shown in the solution above (it cancels out).
  • Express Rates as Fractions of Work per Day: If a person completes a task in \(D\) days, their work rate is \(1/D\) of the task per day. If W is the total work, their rate is \(W/D\).
  • Combine Rates for Joint Work: If A's rate is \(r_A\) and B's rate is \(r_B\), their combined rate is \(r_A + r_B\). The time they take together is \(W / (r_A + r_B)\).
  • Handle Partial Work: If a person works for a certain time or completes a fraction of the work, use the formula \(\text{Work Done} = \text{Rate} \times \text{Time}\) or \(\text{Time Taken} = \text{Work Done} / \text{Rate}\).
  • System of Equations: Most complex problems translate into a system of equations that need to be solved to find the unknown rates or times.
  • Check Efficiency Conditions: If the problem specifies that one person is more efficient than another, use this condition to validate your results or choose between multiple solutions (like the quadratic equation roots in this problem).

These strategies help break down complex work and time scenarios into manageable algebraic steps.

Was this answer helpful?

Similar Questions

  1. 4 workers working 6 hours per day can finish painting a wall in 21 days. If 7 workers work for 4 hours per day, in how many days will they be able to finish the same work?

  2. A and B can complete a piece of work in 10 days and 15 days respectively. B starts the work and is joined by A after 5 days. If they earn a total of Rs. 60, what are their individual shares?

  3. A and B together can do a piece of work in 10 days. If A can do the work in 15 days, find in how many days that B alone can do the same work. Given below are the steps involved in solving the above problem. Arrange them in sequential order.

    (A) One day’s work of B is 1/10 - 1/15

    (B) One day’s work of A and B is 1/10 and one day’s work of A is 1/15

    (C) B alone can do the work in 30 days

    (D) One day’s work of B is 1/30
  4. A pump can fill a tank in 4 hours, but due to a leak, the tank now gets filled in 5 hours. How long will it take the leakage to empty the tank when it is full?

  5. Mugdha and Mayuri, working together, can complete a job in 18 days. However, Mayuri works alone and leaves after completing two-fifths of the job and then Mugdha takes over and completes the remaining work by herself. As a result, the duo could complete the job in 39 days. How many days would Mugdha alone have taken to do the job if Mayuri worked faster than Mugdha?

  6. Pramod can paint a wall red in 12 hours while Brajen can paint the wall red completely in 16 hours. If Pramod and Brajen work alternately for an hour each stalling when the wall has just cement on it till when it is completely painted red, how many hours will it take to paint the entire wall red?

  7. Arjun and Anurag complete a job in 5 days and 6 days respectively. They worked together and earned a total of Rs. 770. Find Arjun’s share in this amount (in Rs.).

  8. A and B can complete a task in 10 days, B and C can complete it in 15 days while C and A can do the same task together in 12 days. How many days will they together take to complete the task?

  9. 10 people could complete a task in 8 days. After 4 days, 2 of the workers left. How many days from then did it take to complete the remaining task?

  10. Sharan and Mayukh, working together, can complete a task in 18 days. However, Mayukh works alone and leaves after completing one-third of the task. Then, Sharan takes over and completes the remaining work by himself. As a result, the duo could complete the task in 40 days. How many days would Sharan alone have taken to do the job if Mayukh had worked faster than Sharan?


Important Questions from Work Efficiency

  1. M is thrice as efficient as workman as N and therefore is able to finish a job in 264 days less than N. Then in how many days can N finish the entire work?
  2. A can do a piece of work in $1455$ days. B is $25\%$ more efficient than A. Find the number of days taken by B to do the same piece of work.
  3. 45 people take 18 days to dig a pond. If the pond would have to be dug in 15 days, then the number of people to be employed will be
  4. A stock of food is enough for 240 men for 48 days. How long will the same stock last for 160 men?
  5. One contractor had undertaken a construction work. To complete the given job, he sought labour comprising 24 men for 12 days for working 10 hours a day. But due to festival season, as the labour had gone to their respective hometowns, he could get only 15 men and they too were willing to work 8 hours a day. With this much labour, in how many days would he be able to complete the same job?

Need Expert Advice?
Upcoming Exams
RRB Paramedical
November 23, 2026
RRB Staff Nurse
November 23, 2026
Test Series
RRB ALP img
Railways
RRB ALP 2026 Mock Test series
1035 Tests 1 Tests Free
1802 Attempts
4.3(260)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App