To compute function points (FP), the following relationship is used FP = Count – total × (0.65 + 0.01 × Σ(Fi)) where Fi (i = 1 to n) are value adjustment factors (VAF) based on n questions. The value of n is
14
Count-total is the unadjusted function point count, the weighted sum of external inputs, external outputs, external inquiries, internal logical files and external interface files.
It is then adjusted for the general characteristics of the system. In Pressman's formulation these are answers to 14 questions (data communications, distributed processing, performance, heavily used configuration, transaction rate, online data entry, end-user efficiency, online update, complex processing, reusability, installation ease, operational ease, multiple sites, facilitate change), each rated from 0 (no influence) to 5 (essential).
Hence \(\Sigma F_i\) ranges from 0 to \(14 \times 5 = 70\), so the adjustment factor \(0.65 + 0.01 \times \Sigma F_i\) lies between 0.65 and 1.35, i.e. ±35 %. The number of questions is n = 14.
Hence, the answer is 14.
Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ?
In CRC based design, a CRC Team consists of :
(a) one or two users representatives
(b) several programmers
(c) project co-ordinators
(d) one or two system analysts
Codes :
Which one of the following non-functional quality attributes is not highly affected by the architecture of the software ?
Requirements prioritisation and negotiation belongs to :
Match the following :
| (a) Size-oriented metrics | (i) uses number of external interfaces as one of the measurement parameter. |
| (b) Function-oriented metrics | (ii) originally designed to be applied to business information systems. |
| (c) Extended Function Point metrics | (iii) derived by normalizing quality and/or productivity measures by considering the size of the software. |
| (d) Function point | (iv) uses algorithm characteristics as one of the measurement parameter. |
Codes :
Match the following :
| List - I | List - II |
| a. Correctness | i. The extent to which a software tolerates the unexpected problems |
| b. Accuracy | ii. The extent to which a software meets its specifications |
| c. Robustness | iii. The extent to which a software has specified functions |
| d. Completeness | iv. Meeting specifications with precision |
Consider a project with the following functional units :
Number of user inputs = 50
Number of user outputs = 40
Number of user enquiries = 35
Number of user files = 06
Number of external interfaces = 04
Assuming all complexity adjustment factors and weighing factors as average, the function points for the project will be
In function point analysis, the number of complexity adjustment factors is
Which one of the following is not the part of requirement management?
Collaborative document inspection technique used for?
What is the other name of Data Flow Diagram (DFD)?
The process followed in order to find difficult, unknown and hidden information about a software system is called