In function point analysis, the number of complexity adjustment factors is
14
Function point analysis adjusts the unadjusted function count using general system characteristics such as data communications, performance and reusability.
There are 14 such complexity adjustment factors, each rated from 0 to 5, and their sum is used in \(VAF = 0.65 + 0.01 \times \sum F_{i}\).
Hence, 14.
To compute function points (FP), the following relationship is used
FP = Count – total × (0.65 + 0.01 × Σ(Fi)) where Fi (i = 1 to n) are value adjustment factors (VAF) based on n questions. The value of n is
Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ?
In CRC based design, a CRC Team consists of :
(a) one or two users representatives
(b) several programmers
(c) project co-ordinators
(d) one or two system analysts
Codes :
Which one of the following non-functional quality attributes is not highly affected by the architecture of the software ?
Requirements prioritisation and negotiation belongs to :
Match the following :
| (a) Size-oriented metrics | (i) uses number of external interfaces as one of the measurement parameter. |
| (b) Function-oriented metrics | (ii) originally designed to be applied to business information systems. |
| (c) Extended Function Point metrics | (iii) derived by normalizing quality and/or productivity measures by considering the size of the software. |
| (d) Function point | (iv) uses algorithm characteristics as one of the measurement parameter. |
Codes :
Match the following :
| List - I | List - II |
| a. Correctness | i. The extent to which a software tolerates the unexpected problems |
| b. Accuracy | ii. The extent to which a software meets its specifications |
| c. Robustness | iii. The extent to which a software has specified functions |
| d. Completeness | iv. Meeting specifications with precision |
Consider a project with the following functional units :
Number of user inputs = 50
Number of user outputs = 40
Number of user enquiries = 35
Number of user files = 06
Number of external interfaces = 04
Assuming all complexity adjustment factors and weighing factors as average, the function points for the project will be
Which one of the following is not the part of requirement management?
Collaborative document inspection technique used for?
What is the other name of Data Flow Diagram (DFD)?
The process followed in order to find difficult, unknown and hidden information about a software system is called