What is an effective way to limit settlement due to subsoil moisture movement?

This question was previously asked in
RRB JE 2025 CBT 2 Mechanical and Allied Engg Question Paper English (2-Jul-2026) (Shift-1)
The correct answer is

Providing plinth protection and proper compaction

In Soil Mechanics and Foundation Engineering, managing settlement due to subsoil moisture movement is crucial for maintaining structural integrity. Settlement can cause severe problems for structures over time. One effective technique to mitigate this issue is providing plinth protection and ensuring proper compaction. Let's analyze the options:

  1. Increasing the height of the masonry wall structure: This option focuses on structural change without addressing subsoil moisture movement. It doesn't prevent differential settlement induced by changes in moisture content.
  2. Providing plinth protection and proper compaction: Plinth protection acts as a barrier reducing water infiltration near the foundation. Proper compaction of soil increases its density, reducing voids, and leading to better resistance against moisture-induced movement. This directly addresses the cause of settlement, making it the correct solution.
  3. Adding additional reinforcement within the foundation system: While reinforcement strengthens a structure, it doesn't prevent settlement caused by subsoil moisture. It merely provides additional stability to withstand loads, not moisture changes.
  4. Reducing the thickness of the foundation wall structure: Reducing thickness can weaken a structure and does not relate to controlling moisture movement in subsoil, potentially aggravating settlement issues.

Therefore, the most effective way to limit settlement due to subsoil moisture movement is by providing plinth protection and proper compaction, ensuring a stable and moisture-protected foundation.

Was this answer helpful?

Similar Questions

  1. Which layer of soil is compacted to increase its bearing strength and reduce settlement in construction work?


Important Questions from Compaction

  1. In soil compaction, if the MDD (Maximum Dry Density) has to be increased and that too at all lower OMC (Optimum Moisture Content), then the method required is

  2. The densification of a soil by means of mechanical manipulation is called

  3. Which of the following is NOT correct about the effects of compaction of soil?

  4. Which of the following roller is used to compact the coarse-grained soil?

  5. For standard compaction test done on soil, the mass of hammer and drop of the hammer are:

Need Expert Advice?
Test Series
RRB JE img
Railways
RRB JE Prev. Yr. Paper (CBT 1 + CBT 2) Test Series
290 Tests 5 Tests Free
4503 Attempts
4.3(88)
English

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App