If 5 workers, working at the same rate, complete a job in 12 days, how many days will 10 workers take to complete the same job?

This question was previously asked in
RRB ALP 2025 CBT 2 Mechanic Motor Vehicle Question Paper (28-Jul-2026) (Shift 1)
The correct answer is

6 days

The job is fixed in size, so more workers finish sooner: the number of workers and the days taken are inversely proportional.

Measure the fixed job as total effort in worker-days: \(5\ \text{workers}\times12\ \text{days}=60\ \text{worker-days}\).

The same 60 worker-days must now be shared among 10 workers.

So the days required are \(\dfrac{60}{10}=6\ \text{days}\).

The logic is confirmed by proportion: doubling the workforce from 5 to 10 halves the time from 12 to 6 days.

Answers like 5 or 10 days ignore the inverse relationship, and 12 days would mean the extra workers did nothing.

Hence, the answer is 6 days.

Was this answer helpful?

Similar Questions

  1. Three workers, X, Y, and Z, can complete a certain job in 10 days, 12 days, and 15 days, respectively. Determine the number of days required for them to complete the job when they work together.

  2. A piece of work can be done by 16 men in 8 days working 12 hours a day. How many men are needed to complete another work, which is three times the first one, in 24 days working 8 hours a day?
  3. Ajay can do a painting in 12 days. Amit is 70% more efficient than Ajay. What is the number of days Amit would need to finish the same painting?

Important Questions from Time and work

  1. In a circular race on a track of length 2000 m, X and Y start from the same point at the same time in opposite directions at the speeds of 15 km/h and 33 km/h, respectively. After how much time will they meet next?

  2. Which of the following option figures will complete the pattern in the figure given below?

  3. A has completed two-third of a job in 8 days, and B completes the rest of the job in 20 days. In how many days can they together complete the job?

  4. The smallest 4-digit prime number is:

  5. If Anand can do a piece of work in 9 days and Vinod can complete the same work in 6 days, then in how many days will both of them complete it together?

Need Expert Advice?
Upcoming Exams
RRB NTPC
September 27, 2026
Test Series
RRB ALP img
Railways
RRB ALP 2026 Mock Test series
1035 Tests 1 Tests Free
858 Attempts
4.3(235)
English, Hindi
More Questions from RRB ALP

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App