If 5 workers, working at the same rate, complete a job in 12 days, how many days will 10 workers take to complete the same job?
6 days
The total work is fixed, so the number of workers and the days taken are inversely proportional.
Total effort \(=5\ \text{workers}\times12\ \text{days}=60\ \text{worker-days}\).
With 10 workers, days needed \(=\dfrac{60}{10}=6\ \text{days}\).
Doubling the workforce halves the time, which confirms the result.
Hence, the answer is 6 days.
Three workers, X, Y, and Z, can complete a certain job in 10 days, 12 days, and 15 days, respectively. Determine the number of days required for them to complete the job when they work together.
In a circular race on a track of length 2000 m, X and Y start from the same point at the same time in opposite directions at the speeds of 15 km/h and 33 km/h, respectively. After how much time will they meet next?
Which of the following option figures will complete the pattern in the figure given below?

A has completed two-third of a job in 8 days, and B completes the rest of the job in 20 days. In how many days can they together complete the job?
The smallest 4-digit prime number is:
If Anand can do a piece of work in 9 days and Vinod can complete the same work in 6 days, then in how many days will both of them complete it together?