A and B can together complete a piece of work in 5 days. They worked together for 4 days, and then B left. After another 2 days, A completed the remaining work. In how many days can A complete the entire work alone?
10
The correct answer is Option 3 i.e. 10.
Let A alone complete the work in x days
A's 1 day work = \(1\over x\)
1 day work of A and B = \(1\over 5\)
Work done in first 4 days = 4 × \(1\over 5\) = \(4\over 5\)
Remaining work = 1 - \(4\over 5\) = \(1\over 5\)
A's 1 day work = \(1\over 5\) ÷ 2 = \(1\over 10\)
⇒ x = 10 days
P is 30% more efficient than Q. How much time will they, working together, take to complete a job that P alone could have done in 23 days?
8 men and 12 women can build a wall in 10 days. 6 men and 8 women can build the same wall in 14 days. How long will it take for 2 women and 1 man to build it together?
If 6 men and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same work in 2 days, then the time taken by 10 men and 20 boys for doing the same piece of work will be:
8 men and 12 women can build a wall in 10 days. 6 men and 8 women can build the same wall in 14 days. How long will it take for 1 woman to build it alone?
Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?
8 men and 12 women can build a wall in 10 days. 6 men and 8 women can build the same wall in 14 days. How many more days will 1 woman take to build that wall alone compared to the number of days 1 man will take to build same wall alone?
48 men can do a work in 5 days while 40 women can do the same work in 9 days. In how many days can 4 men and 6 women together do the same work?
If 6 men and 8 boys can do a piece of work in 10 days, while 26 men and 48 boys can do the same work in 2 days, then the time taken by 20 men to do the same piece of work is:
A can complete a piece of work in 20 days and B can do the same work in 15 days. B worked alone for 6 days and left. In how many days can A complete the remaining work alone?
6 men or 5 women can complete a job in 7 days. 6 men work for 5 days and leave. The number of women required to complete the remaining work in 5 days is:
A person can complete 20% of work in 8 days and another person y can complete 25% of the same work in 6 days. If they work together, in how many days will 40% of the work be completed?
P works thrice as fast as Q, whereas P and Q together can work four times as fast as R. If P, Q and R together work on a job, in what ratio should they share the earnings?
There are three pillars X, Y and Z of different heights. Three spiders A, B and C start to climb on these pillars simultaneously. In one chance, A climbs on X by 6 cm but slips down 1 cm. B climbs on Y by 7 cm but slips down 3 cm. C climbs on Z by 6.5 cm but slips down 2 cm. If each of them requires 40 chances to reach the top of the pillars, what is the height of the shortest pillar?
There is an order of 19000 quantity of a particular product from a customer. The firm produces 1000 quantity of that product per out of which 5% are unfit for sale. In how many days will the order be completed?
Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire job alone?