Question

Which of the following steps helps prevent void formation during epoxy resin casting in underground cable joints?

This question was previously asked in
RRB NTPC 2025 Graduate Level CBT 1 Question Paper (25-Mar-2026) (Shift 3)
The correct answer is

Slowly pour resin while tapping the joint body

Sound cast-resin insulation depends on the resin filling every space around the conductors without trapping air, because voids are weak spots where the electric field concentrates and partial discharge begins.

During epoxy casting in a cable joint, air can be caught in the mould as the resin is introduced, and unless it is released it forms these harmful voids.

Pouring the resin slowly lets the liquid creep into every gap and gives trapped air time to rise, while gently tapping the joint body shakes bubbles loose so they float up and escape before the resin sets.

Pouring the resin quickly to beat the hardening time does the opposite, whipping in and sealing air pockets rather than releasing them.

Mixing the resin near the joint after sealing, or sealing the joint body before pouring, both close off the escape route so any entrained air stays inside as voids.

The slow, tapped pour is therefore the technique that actively drives the air out and prevents void formation.

Hence, the answer is Slowly pour resin while tapping the joint body.

Was this answer helpful?

Similar Questions

  1. In which situation is DC transmission preferred over AC transmission in power networks?

  2. What is the purpose of the Cable Sheath Continuity Test in underground cables?

  3. Which of the following methods is used to detect an oil leak in an underground oil filled cable joint without excavation?

  4. While repairing overhead transmission lines, which type of wire joint is most suitable for joining two stranded conductors with high current carrying requirements?

  5. Which of the following equipment provides surge protection in substations?

  6. Choose the correct sequence for erecting an overhead transmission line.

     1. Foundation work 

    2. Tower erection 

    3. Conductor stringing 

    4. Insulator installation

  7. Which type of substation would be strategically installed on a high-voltage transmission line to improve network reliability by isolating faults without changing voltage levels?

  8. What is the purpose of a pre-molded joint in underground cables?

  9. A technician is using the Murray loop test to locate a ground fault in a two-core cable. Which essential component must be connected to complete the test setup?


Important Questions from Transmission and Distribution

  1. For household wiring and small units, the following should be used as a safety measure:

  2. The minimum clearance distance that equipment should be kept away from 50 kV power lines is:

  3. What is the purpose of a lighting arrester connected between the line and earth in a power S/M?

  4. From the given options, identify the type of lug used for connecting an aluminum cable to a copper bus bar.

  5. What is the color of neutral in three core flexible cables?

Need Expert Advice?
Upcoming Exams
RRB NTPC
September 27, 2026
Test Series
RRB ALP img
Railways
RRB ALP 2026 Mock Test series
1035 Tests 1 Tests Free
741 Attempts
4.3(233)
English, Hindi
More Questions from RRB ALP

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App