Which of the following RCC elements transfers the Floor finish load to supporting beams?

This question was previously asked in
RRB JE 2025 CBT 2 Mechanical and Allied Engg Question Paper English (2-Jul-2026) (Shift-1)
The correct answer is

Slab

To determine which Reinforced Cement Concrete (RCC) element transfers the floor finish load to the supporting beams, let's examine the functions of each provided option:

  1. Parapet Wall: This is a low protective wall that is positioned at the edge of a roof, balcony, or terrace. It primarily functions as a barrier and is not involved in transferring floor loads.
  2. Lintel: A lintel is a structural element situated above doors, windows, or portals to support the load from the structure above and distribute it to the sides of the opening. Similar to the parapet, it is not responsible for transferring floor loads.
  3. Column: Columns are vertical structural elements that primarily support axial loads from the structure above, transferring them down to the foundation. They don't directly transfer floor loads like floor finishes to beams.
  4. Slab: The slab is a horizontal structural component that lays on top of beams and columns, forming floors and ceilings. Slabs bear vertical loads such as the load from its own weight, floor finishes, furniture, and occupants. They are directly responsible for transferring these loads to the supporting beams.

The correct answer is the Slab, as it serves as the main horizontal member collecting the load from the floor finishes and transmitting it to the underlying support beams. This mechanism allows slabs to efficiently distribute loads to beams, which in turn transfer these forces to columns and ultimately to the ground.

In summary, considering the role of each element in an RCC structure, the slab's function of directing surface loads such as floor finishes to the supporting beams is evident and crucial to the load transfer process.

Was this answer helpful?

Similar Questions

  1. Which of the following correctly represents the concrete contribution to shear strength V in Limit State Method (LSM) design? c

  2. If the calculated nominal shear stress $τ_v$  in a reinforced concrete beam exceeds the v maximum permissible shear stress in concrete $τ_c$ as per IS 456:2000, what is the cmax , appropriate course of action?

  3. In a reinforced concrete beam, the development length is provided to prevent ______.


Important Questions from Beams and Slabs

  1. If W is the load in a circular slab of radius R, the maximum radial moment at the center of the slab is

  2. If the ratio of the span to the overall depth does not exceed 7, the stiffness of the beam will ordinarily be satisfactory in case of a

  3. The maximum permissible size of aggregates to be used in casting the ribs of a slab is

  4. The thickness of the topping of a ribbed slab, varies between

  5. In order to satisfy the requirements of Fe500D steel for reinforcement purpose, the 0.2% proof stress (MPa) should be a minimum of:

Need Expert Advice?
Test Series
RRB JE img
Railways
RRB JE (CBT 1 + CBT 2) 2026 Mock Test Series
1355 Tests 20 Tests Free
4.3(87)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App