During a real-life pipeline repair, what sequence ensures both safety and weld integrity?

This question was previously asked in
RRB ALP 2025 CBT 2 Wiremen Question Paper (28-Jul-2026) (Shift 2)
The correct answer is

Isolating pipeline, cleaning joint, aligning, tack welding, final welding

For hot work on a pipeline the governing rule is that safety is secured before any welding, and then the joint is built up in the order that guarantees a sound weld.

The first step must therefore be isolating the pipeline, draining and depressurising it, so there is no flammable content or pressure during welding.

Next the joint is cleaned to remove rust, scale and grease that would otherwise cause weld defects.

The pipe ends are then aligned to the correct fit-up so the joint geometry is right before any metal is deposited.

Tack welds are made to lock the aligned pipes in position, and only then is the final full weld carried out to complete the joint.

Any sequence that welds before isolating the line, or tacks before cleaning and aligning, risks either an explosion or a misaligned, dirty joint, so those orders are unsafe or unsound.

Hence, the answer is Isolating pipeline, cleaning joint, aligning, tack welding, final welding.

Was this answer helpful?

Similar Questions

  1. Which of the following equipment is used in arc welding?

  2. The electrodes are manufactured in two standard lengths namely:

  3. The simplest type of a seam is a ___________.

  4. The colour code used for hose pipe for oxygen line is _______

  5. What is the colour of Argon cylinder?

  6. Gas welding is also known as:

  7. The inner core of the flame in gas welding has _______ temperature

  8. What is the color of an oxygen gas cylinder?

  9. A process of joining similar metals by application of heat with or without application of pressure and addition of filter material is called ______

  10. Acetylene gas is dissolved in ________ for safe storage and usage.


Important Questions from Welding

  1. The flame which contains excess oxygen than theoretical required:

  2. In gas welding, the inclination of the blow pipe with respect to the plate in Leftward welding is-

  3. In resistance welding, the SCR contactor will close during ____

  4. In the flash butt welding:

  5. Carburising flame is used to weld metals like _____.

Need Expert Advice?
Upcoming Exams
RRB JE
October 27, 2026
RRB ALP
November 03, 2026
Test Series
RRB ALP img
Railways
RRB ALP 2026 Mock Test series
1035 Tests 1 Tests Free
1303 Attempts
4.3(246)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App