Associate the terms in Group-I with the building hardware in Group-II

       Group-IGroup-II
P Parliamentary1Bar
Q Aldrop2Lock
R Panic3Hinge
S Mortise4Bolt

The correct answer is

 P-3, Q-4, R-1, S-2

Matching Building Hardware Terms: Group I & II

This solution identifies the correct building hardware corresponding to each term listed in Group I.

Understanding Hardware Associations

  • P: Parliamentary is associated with 3: Hinge. Specific types of hinges, like pivot hinges, are sometimes referred to as parliamentary hinges.
  • Q: Aldrop is correctly matched with 4: Bolt. An Aldrop is a type of sliding bolt or fastener used on doors.
  • R: Panic refers to hardware used on emergency exits, specifically matching with 1: Bar (i.e., panic bar or push bar).
  • S: Mortise is associated with 2: Lock. A mortise lock is a lock mechanism installed within a pocket cut into the door's edge.

Correct Pairings Summary

Based on these associations, the correct matching is:

P-3, Q-4, R-1, S-2

Was this answer helpful?

Important Questions from Building Construction Techniques

  1. Match the brick masonry bond type in Group I with the corresponding illustration in Group II

     

    Group IGroup II
    (P) Rat Trap(1)
    (Q) English(2)
    (R) Flemish(3)
    (S) Stretcher(4)
     (5)
  2. Cold joint' refers to the
  3. Match the Elements in Group - I with their Applications in Group - II
    Group - IGroup - II
    P Bracket1 Door
    Q Baluster2 Dome
    R Key stone3 Cornice
    S Holdfast4 Arch
    5 Staircase
  4. Match the Vibrator Types in Group-I with their related Areas of Application in Group-II
    Group-IGroup-II
    P Needle Vibrator1 Concrete Pavement
    Q Shutter Vibrator2 Pre-cast Concrete Unit
    R Surface Vibrator3 Beam-Column Junction
    S Table Vibrator4 Retaining Wall
    5 Slip Forming
  5. Match the type of Temporary Structures in Group - I with their corresponding Functions in Group - II
    Group-IGroup-II
    P Scaffolding1 To support unsafe structure
    Q Formwork2 To support platforms for workmen and materials at raised height during construction
    R Shoring3 Removal of water from pits
    S Underpinning4 Mould for RCC Structure
    5 Strengthening the existing foundation
Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App