Group-I Group-II P Scaffolding 1 To support unsafe structure Q Formwork 2 To support platforms for workmen and materials at raised height during construction R Shoring 3 Removal of water from pits S Underpinning 4 Mould for RCC Structure 5 Strengthening the existing foundation
This solution involves matching the temporary construction structures listed in Group I with their appropriate functions from Group II.
The correct matching is determined as follows:
Combining these matches gives the result: P-2, Q-4, R-1, S-5. This corresponds to the first option.
| Group - I | Group - II |
| P Bracket | 1 Door |
| Q Baluster | 2 Dome |
| R Key stone | 3 Cornice |
| S Holdfast | 4 Arch |
| 5 Staircase |
| Group-I | Group-II |
| P Needle Vibrator | 1 Concrete Pavement |
| Q Shutter Vibrator | 2 Pre-cast Concrete Unit |
| R Surface Vibrator | 3 Beam-Column Junction |
| S Table Vibrator | 4 Retaining Wall |
| 5 Slip Forming |
The number of standard cement bags required to prepare 1400 kg of concrete in the ratio of 1:2:4 (mixed by weight batching) is _______________