The amber signal in traffic control is meant to:

This question was previously asked in
RRB JE 2025 CBT 2 Mechanical and Allied Engg Question Paper English (2-Jul-2026) (Shift-1)
The correct answer is
Indicate transition between stop and go, warning drivers to clear or prepare to stop

The question involves understanding the purpose of the amber signal in traffic control systems. Let's examine the options one by one:

  1. The option suggests that the amber signal functions as a flashing warning light during off-peak hours. However, this is typically associated with traffic lights in a flashing mode to indicate caution, not specifically the amber light.
  2. This option states that the amber signal indicates crossing traffic has the right of way. This is incorrect, as the right of way is usually indicated by green signals or specific traffic signs, not an amber light.
  3. According to this option, the amber signal indicates that vehicles must continue moving without interruption. This is inaccurate; the green light is usually the one to indicate that vehicles can move without stopping.
  4. The correct understanding, as given in this option, is that the amber signal indicates a transition between stop and go. It warns drivers to either clear the intersection if they can do so safely or prepare to stop as the light is about to change to red.

The amber light's primary role is to signal caution, preparing the drivers for a change in signal. It serves as an intermediate alert between the green (go) and red (stop) lights in traffic signals.

Thus, the correct answer is indeed: Indicate transition between stop and go, warning drivers to clear or prepare to stop.

Was this answer helpful?

Important Questions from Traffic Engineering

  1. Match the following types of signs with their board shapes as per IRC 67:

    ARegulatory signiTriangular shape
    BInformatory signiiCircular shape
    CWarning signiiiRectangular shape
  2. Signs having red border, white background and black symbols are:

  3. An isolated two-phase traffic signal is designed by Webster’s method. Determine the optimum signal cycle, if the sum of all critical flow ratios is 0.50 and the all-red time required for pedestrian crossing is 13 seconds.

  4. The road geometrics in India is designed for:

  5. Which are the method adopted for measuring the running speed and journey speed of a vehicle?

Need Expert Advice?
Test Series
RRB JE img
Railways
RRB JE (CBT 1 + CBT 2) 2026 Mock Test Series