With reference to Squinch adopted in dome construction, choose the correct option related to statements P and Q. 

P: Squinch is a structural element used to support the base of a circular or octagonal dome that surmounts a square hall. 

Q: Squinch is a double layered dome comprising of an inner and an outer layer of masonry.

The correct answer is
P is true but Q is false

Squinch Analysis in Dome Construction

This solution analyzes two statements, P and Q, regarding the architectural term 'Squinch', often used in dome construction.

Statement P Evaluation

  • Statement P: Squinch is a structural element used to support the base of a circular or octagonal dome that surmounts a square hall.
  • Analysis: A squinch is correctly defined as a structure that bridges the upper corners of a square bay, facilitating the transition to an octagonal or circular base required for supporting a dome. Therefore, statement P is accurate.
  • Result: P is true.

Statement Q Evaluation

  • Statement Q: Squinch is a double-layered dome comprising of an inner and an outer layer of masonry.
  • Analysis: This statement describes a double-shelled dome, a different architectural feature. A squinch is a transitional structural element at the base, not the dome itself, and it is typically a single unit (like arches or lintels across corners), not a double-layered structure. Therefore, statement Q is incorrect.
  • Result: Q is false.

Conclusion

Based on the analysis, statement P is true, and statement Q is false. This corresponds to Option B.

Was this answer helpful?

Important Questions from Building Construction Techniques

  1. Match the Elements in Group - I with their Applications in Group - II
    Group - IGroup - II
    P Bracket1 Door
    Q Baluster2 Dome
    R Key stone3 Cornice
    S Holdfast4 Arch
    5 Staircase
  2. Match the Vibrator Types in Group-I with their related Areas of Application in Group-II
    Group-IGroup-II
    P Needle Vibrator1 Concrete Pavement
    Q Shutter Vibrator2 Pre-cast Concrete Unit
    R Surface Vibrator3 Beam-Column Junction
    S Table Vibrator4 Retaining Wall
    5 Slip Forming
  3. Match the type of Temporary Structures in Group - I with their corresponding Functions in Group - II
    Group-IGroup-II
    P Scaffolding1 To support unsafe structure
    Q Formwork2 To support platforms for workmen and materials at raised height during construction
    R Shoring3 Removal of water from pits
    S Underpinning4 Mould for RCC Structure
    5 Strengthening the existing foundation
  4. The number of standard cement bags required to prepare 1400 kg of concrete in the ratio of 1:2:4 (mixed by weight batching) is _______________

  5. An element constructed at intervals along the length of a wall to stabilize it against overturning is