All Exams Test series for 1 year @ ₹349 only
Question

The first bullet train project in India aims to run a bullet train at 320 kmph along a high-speed rail (HSR) track between _______.

This question was previously asked in
SSC CGL 2022 Tier-II (Paper 2 JSO) Previous Year Paper (04-Mar-2023)
The correct answer is

Ahmedabad and Mumbai

India's First Bullet Train Project Route

The question asks about the route of the first bullet train project in India, specifically where the high-speed rail (HSR) track is being built for a train aiming to run at 320 kmph.

High-speed rail projects are being developed in various parts of the world to significantly reduce travel time between major cities. India's first such project is a landmark initiative.

Let's look at the options provided and determine the correct route for this ambitious project:

  • Jaipur and Mumbai: While Mumbai is a major city, Jaipur is not the other end of the first bullet train corridor.
  • Ahmedabad and Mumbai: This route connects two significant economic hubs in Western India.
  • Delhi and Hyderabad: Both are major cities, but this is not the route chosen for the first bullet train project.
  • Kolkata and Chennai: These are major metropolitan cities in different parts of India, not connected by the first bullet train route.

Based on official plans and project details, the first high-speed rail corridor, often referred to as the bullet train project, is being constructed between Ahmedabad and Mumbai. The project aims to connect these two cities with a high-speed train capable of reaching speeds up to 320 kmph, significantly reducing travel time compared to conventional trains.

Therefore, the correct answer identifying the route for India's first bullet train project running at 320 kmph along a high-speed rail track is Ahmedabad and Mumbai.

Understanding the Bullet Train Project in India

The Mumbai-Ahmedabad High-Speed Rail Corridor is India's first and most significant bullet train project. The project is being executed by the National High-Speed Rail Corporation Limited (NHSRCL). The route covers a distance of over 500 kilometers.

Key aspects of the project include:

  • Target Speed: 320 kmph
  • Route: Ahmedabad to Mumbai
  • Technology: Shinkansen technology from Japan
  • Purpose: To reduce travel time between the two cities to around 2-3 hours from the current 6-7 hours.

Why Ahmedabad-Mumbai is the First Bullet Train Route

The choice of the Ahmedabad-Mumbai corridor for the first bullet train project was based on several factors, including economic importance, traffic volume between the two cities, and regional development goals. This route connects Gujarat, a major industrial state, with Maharashtra, the state home to India's financial capital, Mumbai, making it a high-priority corridor for faster connectivity.

Revision Table: India's First Bullet Train

Feature Detail
Project India's First Bullet Train (High-Speed Rail)
Route Ahmedabad to Mumbai
Target Speed 320 kmph
Technology Partner Japan (Shinkansen)
Executing Body NHSRCL

Additional Information: High-Speed Rail in India

While the Ahmedabad-Mumbai corridor is the first bullet train project under construction, several other high-speed rail corridors are being planned or surveyed across India to establish a network of high-speed connectivity between major cities. These future corridors aim to further reduce travel times and enhance transportation infrastructure.

Examples of other potential or planned corridors include:

  • Delhi-Varanasi High-Speed Rail Corridor
  • Delhi-Ahmedabad High-Speed Rail Corridor
  • Mumbai-Nagpur High-Speed Rail Corridor
  • Chennai-Mysuru High-Speed Rail Corridor
  • Delhi-Chandigarh-Amritsar High-Speed Rail Corridor

The development of the Ahmedabad-Mumbai bullet train project is a crucial step in bringing high-speed rail technology to India and paving the way for future expansion of the network.

Was this answer helpful?

Similar Questions

  1. The first railway line in India was started from _______ to _______ in 1853.

  2. In Trans – Siberian railway system Vladivostoclies on ______ coast.

  3. Which of the following railway stations has been certified by FSSAI as the country’s first ‘Eat Right Station’?

  4. Which is the only train which runs between Kolkata and Dhaka?

  5. Asansol, Howrah, Malda and Sealdah division come under which railway zone of India?

  6. How is Indian Railways cutting carbon emissions?

  7. What is the main focus of the Amrit Bharat Station Scheme introduced by the Ministry of Railways, Government of India?


Important Questions from Railway

  1. Which railway safety system did India begin implementing nationwide, covering 3,500 km in 2025 at a cost of ₹1,700 crore?

  2. Who was the Chairman and Chief Executive Officer (CEO) of the Railway Board as on 1st May 2025?

  3. How many Amrit Stations were inaugurated by Prime Minister Narendra Modi on 22 May 2025?

  4. Which of the following pairs of Scheme and Target Group, as initiated in the Railway Budget 2016, is / are correctly matched ?
    SchemeTarget Group
    1. Antyodaya Express: For the Reserved Passengers
    2. Deen Dayalu Coaches: For the Unreserved Passengers
    3. Humsafar: For the Reserved Passengers
    4. Tejas: For the Unreserved Passengers

    Select the correct answer using the code given below :
  5. Which one of the following is the name given by Indian Railways to the indigenously manufactured Train 18?
Need Expert Advice?
Upcoming Exams
SSC CPO
November 23, 2026
SSC CHSL
November 30, 2026
SSC JE
November 30, 2026
Test Series
SSC CGL img
SSC
SSC CGL (Tier I + Tier II) 2026 Mock Test Series - Latest Pattern
2574 Tests 6 Tests Free
9166 Attempts
4.2(953)
English, Hindi
More Questions from SSC CGL

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App