Which consideration is important while deciding the capacity of a power station?

This question was previously asked in
RRB JE 2025 CBT 2 Mechanical and Allied Engg Question Paper English (2-Jul-2026) (Shift-1)
The correct answer is

Expected maximum electrical demand and future load growth requirements

To decide the capacity of a power station, it is crucial to consider the expected maximum electrical demand and future load growth requirements. This is because the primary function of a power station is to generate electricity to meet consumer demand. Let's explore this in more detail:

  1. Expected Maximum Electrical Demand: This refers to the highest level of electrical power that the power station is expected to supply at any point in time. It is essential to ensure that the power station's capacity can handle this peak demand to avoid insufficient power supply and potential blackouts.
  2. Future Load Growth Requirements: It is critical to anticipate growth in electrical demand due to urban development, industrial expansion, or population increase. Planning for future load growth ensures that the power station remains adequate over time, avoiding the need for constant upgrades or expansions.

Now, let's evaluate why the other options are not relevant to determining the capacity of a power station:

  • Type of paint applied on generating station external building surfaces: This is related to the aesthetics and environmental protection but does not affect the capacity or efficiency of power generation.
  • Number of ceiling fans installed inside administrative office sections: This is a minor consideration regarding energy consumption within the facility and does not impact the overall generating capacity.
  • Shape of fencing structure surrounding the generating station premises: The design of the fencing does not influence the power generation capacity, though it might relate to security.

The choice of capacity is directly linked to how well the power station can meet both current and future energy needs, ensuring reliability and efficient operation. Therefore, the correct answer is indeed the consideration of expected maximum electrical demand and future load growth requirements.

Was this answer helpful?

Similar Questions

  1. A low demand factor in an electrical installation indicates that:

  2. A maximum demand tariff is designed to encourage consumers to _________________.


Important Questions from Economies of Power Generation

  1. Domestic consumer load is around:

  2. When the rate of electrical energy is charged on the basis of maximum demand of the consumer and the units consumed, it is called:

  3. A power plant has the annual factors given as: load factor = 70 percent, Capacity factor = 50 percent, Use factor = 60 percent. If maximum demand is 20 MW, find the reserve capacity over and above the peak load.

  4. Which of the following is not a type of tariff?

  5. How is energy performance of a plant measured?

Need Expert Advice?
Test Series
RRB JE img
Railways
RRB JE (CBT 1 + CBT 2) 2026 Mock Test Series
1355 Tests 20 Tests Free
4.3(87)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App