Question

Match the items in Group–I with their corresponding items in Group–II.
Group-IGroup-II
(P)Floating floor(1)Overflow control
(Q)Float valve(2)Delay not affecting a project
(R)Metal float(3)Acoustical buffer
(S)Free float(4)Plastering equipment
(5)Traffic flow control

The correct answer is
P-3, Q – 1, R – 4, S – 2

Matching Group I with Group II Items

The question requires matching items from Group I (P, Q, R, S) with their corresponding descriptions in Group II (1, 2, 3, 4, 5).

Item Analysis and Matching:

  • (P) Floating floor: This type of flooring is constructed to provide an acoustical buffer, reducing sound transmission. Therefore, P matches with 3.
  • (Q) Float valve: Commonly used in plumbing systems (like toilet tanks or water heaters), a float valve regulates fluid levels and prevents overflow. Therefore, Q matches with 1.
  • (R) Metal float: In construction, a metal float is a hand tool used for smoothing and finishing surfaces like plaster or concrete during plastering. Therefore, R matches with 4.
  • (S) Free float: In project management, free float is the duration an activity can be delayed without causing a delay to the start of its immediate successor activity, meaning the delay does not affect the project timeline beyond that specific activity. Therefore, S matches with 2.

Final Matches Summary

Based on the analysis, the correct matches are:

  • P corresponds to 3 (Acoustical buffer)
  • Q corresponds to 1 (Overflow control)
  • R corresponds to 4 (Plastering equipment)
  • S corresponds to 2 (Delay not affecting a project)

This corresponds to the pairing P-3, Q-1, R-4, S-2.

Figure 1: Matching Summary Table

Group I Item Group II Item Description
(P) Floating floor 3 Acoustical buffer
(Q) Float valve 1 Overflow control
(R) Metal float 4 Plastering equipment
(S) Free float 2 Delay not affecting a project

Was this answer helpful?

Important Questions from Building Construction Techniques

  1. Match the Elements in Group - I with their Applications in Group - II
    Group - IGroup - II
    P Bracket1 Door
    Q Baluster2 Dome
    R Key stone3 Cornice
    S Holdfast4 Arch
    5 Staircase
  2. Match the Vibrator Types in Group-I with their related Areas of Application in Group-II
    Group-IGroup-II
    P Needle Vibrator1 Concrete Pavement
    Q Shutter Vibrator2 Pre-cast Concrete Unit
    R Surface Vibrator3 Beam-Column Junction
    S Table Vibrator4 Retaining Wall
    5 Slip Forming
  3. Match the type of Temporary Structures in Group - I with their corresponding Functions in Group - II
    Group-IGroup-II
    P Scaffolding1 To support unsafe structure
    Q Formwork2 To support platforms for workmen and materials at raised height during construction
    R Shoring3 Removal of water from pits
    S Underpinning4 Mould for RCC Structure
    5 Strengthening the existing foundation
  4. The number of standard cement bags required to prepare 1400 kg of concrete in the ratio of 1:2:4 (mixed by weight batching) is _______________

  5. An element constructed at intervals along the length of a wall to stabilize it against overturning is
Need Expert Advice?