Jayakwadi (Stage-1) Hydroelectric Project is built on which river?

This question was previously asked in
RRB Group D 2018 Question Paper (22-Sep-2018) (Shift 1)
The correct answer is

Godavari

The Jayakwadi Project is a major multi-purpose irrigation and hydroelectric project of Maharashtra.

It is built across the Godavari river near Paithan in Aurangabad district. The reservoir formed by the dam is called Nathsagar.

The Stage-1 hydroelectric component uses water released from the dam to generate power along with providing irrigation to the Marathwada region and drinking water to nearby towns.

The Indus, Cauvery and Ganga rivers do not have this project on them.

Hence, Godavari.

Was this answer helpful?

Similar Questions

  1. Which of the following river does NOT originate in India?

  2. The Indira Gandhi Canal originates from the ______.

  3. Which river system originates from the Bastar hills of Madhya Pradesh (now Chhattisgarh)?


Important Questions from Indian Rivers and Water Resources

  1. Which one of the following lakes in India has a large quantity of a substance found in the Moon?

  2. Which is the longest tributary river in India?

  3. ‘Ong’ and ‘Tel’ are tributaries of the river ______.

  4. Consider the following statements :

    i. Alamatti dam is on the Cauveri river.

    ii. Mettur dam is on the Krishna river.

    iii. Gandhi Sagar Reservoir is on the Chambal river.

    Which of the statement given above is/are correct ?

  5. Charre-Marre waterfall is located in which Valley ?

Need Expert Advice?
Upcoming Exams
RRB JE
October 27, 2026
RRB ALP
November 03, 2026
Test Series
RRB Group D img
Railways
RRB Group D Mock Test Series 2026 (Latest Pattern)
1198 Tests 1 Tests Free
1827 Attempts
4.1(105)
English, Hindi

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App