Question

Work costs defined as ___________.

The correct answer is

Primary cost plus manufacturing costs

Let's understand the definition of Work costs in cost accounting. Work costs represent the total cost incurred in the factory for converting raw materials into finished goods. This includes the initial costs of bringing materials and labor together, plus all other costs related to the manufacturing process within the factory.

Defining Work Costs

Work costs are specifically defined as the sum of the Primary cost and the manufacturing overhead costs. This is also sometimes referred to as Factory Cost or Production Cost.

  • Primary Cost: This is the direct cost associated with production. It includes Direct Materials, Direct Labor, and Direct Expenses. These are costs that can be directly traced to the product being manufactured.
  • Manufacturing Costs (Factory Overhead): These are all indirect costs incurred in the factory during the production process. This includes indirect materials (like lubricants), indirect labor (like factory supervisors' wages), factory rent, factory utilities, depreciation of factory machinery, etc. These costs cannot be directly traced to a specific product but are necessary for the production process.

Therefore, the formula for Work Costs is:

\(\text{Work Costs} = \text{Primary Cost} + \text{Manufacturing Costs (Factory Overhead)}\)

Let's look at the options provided:

  • Option 1: Primary cost plus manufacturing costs - This aligns directly with the definition of Work costs explained above.
  • Option 2: Factory outlays - While factory outlays are part of Work costs, this term is too general and doesn't specifically define the components (Primary Cost + Manufacturing Costs).
  • Option 3: Initial expense - This term is very vague and does not represent the complete cost incurred in the factory.
  • Option 4: Factory price - This term usually relates to the selling price from the factory's perspective, which includes profit and other costs beyond just the production cost.

Based on the standard definitions in cost accounting, Work costs are the sum of Primary cost and manufacturing costs.

Was this answer helpful?

Important Questions from Line Balancing and Work Study

  1. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be-

  2. Fifty observations of production operation revealed a mean cycle time of 10 min. The worker was evaluated to be performing at 90% efficiency. Assuming the allowances to be 10% of the normal time, the standard time (in minutes) for the job is

  3. Fifty observations of production operation revealed a mean cycle time of 10 min. The worker was evaluated to be performing at 90% efficiency. Assuming the allowances to be 10% of the normal time, the standard time (in minutes) for the job is
  4. A technique of Work measurement in which times established for basic human motions are used to build up the time for a job at the defined level of performance is called:

  5. The time study of machinery operation recorded a cycle time of 7.0, 6.0, 7.0, 8.0 minutes. The performance rating of worker is 95%. The allowance fraction is 0.1. Standard time will be given by:

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App