Fifty observations of production operation revealed a mean cycle time of 10 min. The worker was evaluated to be performing at 90% efficiency. Assuming the allowances to be 10% of the normal time, the standard time (in minutes) for the job is
The question asks us to determine the standard time for a production job, given the mean cycle time, worker efficiency, and allowances.
To find the standard time, we first need to calculate the normal time, and then add the allowances to the normal time.
Normal Time is calculated using the formula:
\(\text{Normal Time} = \text{Observed Time} \times \text{Performance Rating}\)
Given:
Calculation:
\(\text{Normal Time} = 10 \text{ min} \times 0.90\)
\(\text{Normal Time} = 9 \text{ min}\)
Standard Time is calculated by adding allowances to the Normal Time. The allowances are 10% of the Normal Time.
\(\text{Allowances Amount} = 10\% \text{ of Normal Time}\)
\(\text{Allowances Amount} = 0.10 \times 9 \text{ min}\)
\(\text{Allowances Amount} = 0.9 \text{ min}\)
Now, add the allowances to the normal time:
\(\text{Standard Time} = \text{Normal Time} + \text{Allowances Amount}\)
\(\text{Standard Time} = 9 \text{ min} + 0.9 \text{ min}\)
\(\text{Standard Time} = 9.9 \text{ min}\)
Alternatively, we can use the formula:
\(\text{Standard Time} = \text{Normal Time} \times (1 + \text{Allowance Percentage as Decimal})\)
\(\text{Standard Time} = 9 \text{ min} \times (1 + 0.10)\)
\(\text{Standard Time} = 9 \text{ min} \times 1.10\)
\(\text{Standard Time} = 9.9 \text{ min}\)
| Parameter | Value |
|---|---|
| Observed Time (Mean Cycle Time) | 10 min |
| Performance Rating (Efficiency) | 90% (0.90) |
| Normal Time | \(10 \times 0.90 = 9\) min |
| Allowances (% of Normal Time) | 10% (0.10) |
| Allowances Amount | \(0.10 \times 9 = 0.9\) min |
| Standard Time | \(9 + 0.9 = 9.9\) min |
The calculated standard time for the job is 9.9 minutes.
The time study of machinery operation recorded a cycle time of 7.0, 6.0, 7.0, 8.0 minutes. The performance rating of worker is 95%. The allowance fraction is 0.1. Standard time will be given by:
A manufacturing cell has 5 machines A, B, C, D and E. The average cycle time (in minutes) for a job on each of the machines is given in the following table:
| Machine | A | B | C | D | E |
| Average cycle time | 5 | 6 | 5.5 | 4 | 4.5 |
There are three operators in the cell. First operator operates machines A and B. The second operator operates machine C and the third operator operates machines D and E. All the jobs have to move in the following sequence:
$A \to B \to C \to D \to E$
Assuming the job transfer time between two machines to be negligible, the average cycle time (in minutes) for the manufacturing cell is
Employee participation in the planning, organisation, and control of their work is what is referred to as the process of changing the nature of the work to increase job satisfaction and meaning.