Work study involves two main techniques: method study and time study. The goal is to standardize a process for both the best method and the appropriate time required.
The primary objective is process improvement and standardization. This involves finding the most efficient way to perform a task and then determining the standard time needed for its completion.
Method study focuses on improving the way a job is performed. It involves:
This step ensures the task is done efficiently before its duration is measured.
Time study measures the time required to complete a specific task using a standardized method. It involves:
Time study is only meaningful once the method itself has been optimized and standardized.
To effectively standardize a process for both method and time, the sequence must be logical:
Therefore, method study must precede time study for effective process standardization.
The time study of machinery operation recorded a cycle time of 7.0, 6.0, 7.0, 8.0 minutes. The performance rating of worker is 95%. The allowance fraction is 0.1. Standard time will be given by:
A manufacturing cell has 5 machines A, B, C, D and E. The average cycle time (in minutes) for a job on each of the machines is given in the following table:
| Machine | A | B | C | D | E |
| Average cycle time | 5 | 6 | 5.5 | 4 | 4.5 |
There are three operators in the cell. First operator operates machines A and B. The second operator operates machine C and the third operator operates machines D and E. All the jobs have to move in the following sequence:
$A \to B \to C \to D \to E$
Assuming the job transfer time between two machines to be negligible, the average cycle time (in minutes) for the manufacturing cell is
Employee participation in the planning, organisation, and control of their work is what is referred to as the process of changing the nature of the work to increase job satisfaction and meaning.
Fifty observations of production operation revealed a mean cycle time of 10 min. The worker was evaluated to be performing at 90% efficiency. Assuming the allowances to be 10% of the normal time, the standard time (in minutes) for the job is