The Anti-Submarine Warfare Shallow Water Craft (ASW SWC) program involves the delivery of eight specialized vessels to the Indian Navy.
The first of these eight ASW SWC vessels, named Arnala, was delivered to the Indian Navy on 8 May 2025.
Therefore, Arnala is the correct identification for the first ASW SWC delivered.
SAMYUKTA' is an electronic war programme that was developed in India jointly by _________ and the Indian Army.
Which among the following has initiated a nationwide flagship campaign ‘Puneet Sagar Abhiyan’ to clean seashores/ ‘beaches and other water bodies of plastic and other waste materials?
In February 2021, the Defence Ministry of India awarded a contract to manufacture 83 Light Combat Aircraft (LCA) Tejas fighters to ________.
Who became the first woman officer to join Army Aviation Corps as Combat Aviator after the successful completion of training in May 2022?
What was the trilateral naval exercise between India, Japan and The US held in November 2020 called?