All Exams Test series for 1 year @ ₹349 only
Question

What is the name of India’s first engineless train?

This question was previously asked in
RRB NTPC 2019 CBT 1 Question Paper (8-Mar-2021) (Shift 2)
The correct answer is
Vande Bharat Express

Identifying India's First Engineless Train

The question asks to identify the name of India's first train that operates without a separate engine. This type of train is often referred to as 'engineless' because the propulsion system is distributed throughout the trainset.

Examining Train Options

The provided options are:

  • Namami Bharat Express
  • Vande Mataram Express
  • New India Express
  • Vande Bharat Express

Determining the Correct Name

India's first engineless, semi-high-speed train is the Vande Bharat Express. It was conceptualized and manufactured within India under the 'Make in India' initiative, featuring distributed traction power.

Therefore, the correct name is Vande Bharat Express.

Was this answer helpful?

Similar Questions

  1. Where was India's first Vande Bharat Sleeper train unveiled in September 2024?
  2. Indian Railways has introduced various initiatives for passengers. Rail Bandhu is one of them. Is it about:
  3. The first bullet train is expected to connect which cities of India?
  4. Select the option that is different from the rest.
  5. The Gatimaan Express connects Jhansi to:
  6. Which of the following is the Indian railway station having the highest number of platforms?
  7. Operation Thirst' was launched by the:
  8. Pick the odd one out.

    Eastern Railway, Western Railway, West Coast Railway, East Coast Railway
  9. Kolkata metro rail was opened for commercial services in ______.
  10. Select the INCORRECT pair of railway zone and its headquarters.

Important Questions from Railway

  1. In which one of the following places, Headquarters of Eastern Central Railway Zone is located?

  2. The Indian Railways have gone in for qualitative improvements since independence. Which of the following have taken place in recent years?

    1) Gauge conversion

    2) Track electrification

    3) Automatic signals

    Select the correct answer using the codes given below:

  3. Which of the following railway stations has been certified by FSSAI as the country’s first ‘Eat Right Station’?

  4. In Trans – Siberian railway system Vladivostoclies on ______ coast.

  5. The first bullet train project in India aims to run a bullet train at 320 kmph along a high-speed rail (HSR) track between _______.

Need Expert Advice?
Upcoming Exams
RRB ALP
July 28, 2026
RRB Group D
August 03, 2026
Test Series
RRB NTPC img
Railways
RRB NTPC Under Graduate 2026 New Mock Test Series
1459 Tests 2 Tests Free
215 Attempts
4.3(512)
English, Hindi, Telugu +7 More

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App