coffer dam

Understanding Temporary Structures for Water Exclusion

The question asks for the term that describes a temporary structure built in a river or lake specifically to exclude water from a given site. This allows construction or repair work to be carried out in a dry environment. Let's look at the options provided:
  • Earthen dam: This is typically a large, permanent structure made of compacted earth, clay, or rock fill, designed to impound water, creating a reservoir. It is not a temporary structure used to isolate a specific work area within a body of water.
  • Coffer dam: A coffer dam is exactly what the question describes. It is a temporary watertight enclosure that is built in a river, lake, or other body of water to exclude water from an area, creating a dry space for construction or repair work below the water line.
  • Retaining wall: A retaining wall is a structure designed and constructed to resist the lateral pressure of soil when there is a desired change in ground elevation that exceeds the angle of repose of the soil. It is used to hold back soil, not to exclude water from a site within a body of water.
  • Caisson: A caisson is a watertight retaining structure, typically used as part of bridge foundations, quay walls, or other structures built on submerged ground. While used in watery environments, a caisson is usually a type of foundation element or work chamber, rather than a general temporary structure built around a site to exclude water for a larger area of work, which is the primary function of a coffer dam.
Based on these definitions, the structure that fits the description of a temporary construction in a river or lake for excluding water from a given site is a coffer dam. It serves the crucial purpose of creating a dry zone for construction activities that would otherwise be underwater. Therefore, the correct term is coffer dam.
Was this answer helpful?

Important Questions from Shallow Foundation

  1. Which one of the following provides required depth of foundation of a retaining wall?

    Where q: bearing capacity; γ unit weight of the soil; ϕ: angle of repose; B: width of foundation
  2. According to Rankine's formula minimum depth of foundation when q = 180 kN/m 2, γ = 20 kN/m 3and ϕ = 30° is -

  3. The maximum permissible settlement as per IS-1904(1966) for an isolated foundations are :

  4. The IS code used to perform a standard penetration test is:

  5. The observed value of the standard penetration (N) at 10 m depth of silty sand deposit is 13. The unit weight of the soil is 16 kN/m 3. The N value after correcting for the presence of fines will be:

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App