Micro motion study is called____.
Analysis of a man-work approach employing a motion picture camera with a timing device in the field of vision.
Micro motion study is a technique used in industrial engineering and work study to analyze the very fine details of work movements. It is particularly useful for repetitive tasks where small improvements in motion can lead to significant increases in efficiency and reductions in fatigue.
The core idea behind micro motion study is to record an operation using a motion picture camera and then analyze the film frame by frame. A key element is a timing device, such as a microchronometer, placed in the field of view. This device records time in very small units (often 1/2000th of a minute or less), allowing for precise measurement of the time taken for each micro-movement.
Based on this recording, analysts identify fundamental motions, often using therbligs (basic elements of movement like 'grasp', 'move', 'position', etc.), to understand the sequence and efficiency of the operation in extreme detail. This allows for the elimination of unnecessary movements and the improvement of essential ones.
Let's look at the provided options in relation to the definition of micro motion study:
Therefore, the definition that best describes micro motion study is the one that highlights the use of specific recording and timing equipment for detailed analysis of movements.
Micro motion study is correctly defined as the analysis of a man-work approach using a motion picture camera and a timing device. This method allows for minute examination of motions to improve efficiency and reduce fatigue in operations.
The time study of machinery operation recorded a cycle time of 7.0, 6.0, 7.0, 8.0 minutes. The performance rating of worker is 95%. The allowance fraction is 0.1. Standard time will be given by:
A manufacturing cell has 5 machines A, B, C, D and E. The average cycle time (in minutes) for a job on each of the machines is given in the following table:
| Machine | A | B | C | D | E |
| Average cycle time | 5 | 6 | 5.5 | 4 | 4.5 |
There are three operators in the cell. First operator operates machines A and B. The second operator operates machine C and the third operator operates machines D and E. All the jobs have to move in the following sequence:
$A \to B \to C \to D \to E$
Assuming the job transfer time between two machines to be negligible, the average cycle time (in minutes) for the manufacturing cell is
Employee participation in the planning, organisation, and control of their work is what is referred to as the process of changing the nature of the work to increase job satisfaction and meaning.