List - I (Types of project costs) List - II (Description of costs) A. Associate costs I. Cost of producing immediate products/services B. Primary costs II. Cost of indirect benefits/Social benefits C. Indirect costs III. Cost at current market price D. Nominal costs IV. Cost of the maintenance of the project
Choose the correct answer from the options given below :
This section matches project cost types from List - I with their descriptions in List - II based on the provided correct answer structure.
The determined pairings are A-I, B-IV, C-II, and D-III. This specific combination represents the correct matching of List - I items to List - II items.
| List - I | List - II |
|---|---|
| A. Red gram podfly | I. Maruca vitrata |
| B. Plume moth | II. Adisura atkinsoni |
| C. Spotted pod borer | III. Excelastis atmosa |
| D. Field bean pod borer | IV. Melanagromyza obtusa |
| List - I (Bio-herbicide) | List - II (Target Weed) |
|---|---|
| A. Devine | I. Morrenia odorata |
| B. Collego | II. Cyperus esculentus |
| C. Velgo | III. Aeschynomene virginica |
| D. Dr. Biosedge | IV. Abutilon theophrastus |
| List - I (Phosphatic fertilizer) | List - II (Total P2O5 content) |
|---|---|
| A. Rock Phosphate | I. 16% |
| B. Di Calcium Phosphate | II. 48% |
| C. Mono-ammonium phosphate | III. 34% |
| D. Single superphosphate | IV. 27% |