Question

A work study is concerned with

The correct answer is

Improve the method and finding standard time

Work study is a fundamental management technique used in industrial engineering and operations management to improve productivity and efficiency within an organization. It involves a systematic examination of work methods and the time required to perform tasks. The core aim is to optimize processes, reduce waste, and enhance overall operational effectiveness. Work study is primarily divided into two key components:

  • Method Study: This component focuses on analyzing and improving the ways in which work is done. It involves systematically recording, critically examining, and developing new or better methods for performing operations. The goal is to eliminate unnecessary movements, combine tasks, rearrange sequences, or simplify processes to make work easier, faster, and more efficient. Essentially, method study is concerned with finding a "better method" to accomplish a task.
  • Work Measurement (or Time Study): This component is concerned with determining the time required by a qualified worker to complete a specific task at a defined level of performance. Techniques like stop-watch time study, predetermined motion time systems (PMTS), and analytical estimating are used to establish standard times. These standard times are crucial for various aspects of production planning, scheduling, cost estimation, and performance evaluation. In essence, work measurement is about "finding standard time."

Let's analyze the given options in the context of work study:

  • Motivation of workers: While an efficient work environment and fair compensation (which work study can help establish) might indirectly improve worker motivation, the direct and primary focus of work study is not the psychological aspect of worker motivation.
  • Improving production planning and control: Work study provides essential data, such as standard times and improved methods, that are vital inputs for effective production planning and control. However, work study itself is the process of generating this data and improving the methods, not the act of planning or controlling production.
  • Improving the production capability: This is a broader objective that work study helps achieve. By making processes more efficient and productive, work study contributes significantly to enhancing an organization's overall production capability. However, it describes an outcome rather than the specific actions of work study.
  • Improve the method and finding standard time: This option precisely describes the two main pillars and core activities of work study: method study (improving the method) and work measurement (finding standard time). These are the direct concerns and outcomes of a comprehensive work study initiative.

Therefore, a work study is fundamentally concerned with enhancing efficiency and productivity by systematically improving work methods and establishing standard times for tasks.

Was this answer helpful?

Important Questions from Line Balancing and Work Study

  1. A process needs to be standardized for method and time. Which one of the following represents the sequence of work study experiments?
  2. The time study of machinery operation recorded a cycle time of 7.0, 6.0, 7.0, 8.0 minutes. The performance rating of worker is 95%. The allowance fraction is 0.1. Standard time will be given by:

  3. A manufacturing cell has 5 machines A, B, C, D and E. The average cycle time (in minutes) for a job on each of the machines is given in the following table:

    MachineABCDE
    Average cycle time565.544.5

    There are three operators in the cell. First operator operates machines A and B. The second operator operates machine C and the third operator operates machines D and E. All the jobs have to move in the following sequence: 

    $A \to B \to C \to D \to E$ 

    Assuming the job transfer time between two machines to be negligible, the average cycle time (in minutes) for the manufacturing cell is

  4. Work costs defined as ___________.
  5. Employee participation in the planning, organisation, and control of their work is what is referred to as the process of changing the nature of the work to increase job satisfaction and meaning.