The aim of which technique given by F.W. Taylor is to reduce a given line or a product to fixed types, sizes, and characteristics?
Standardisation of work
F.W. Taylor is known as the father of scientific management. He proposed several techniques to improve efficiency and productivity in organizations. The question asks about a specific technique aimed at reducing variations in products or lines to fixed types, sizes, and characteristics. Let's examine the given options in the context of Taylor's principles.
Here's a breakdown of the techniques mentioned in the options:
The question specifically asks for the technique that aims to "reduce a given line or a product to fixed types, sizes, and characteristics". Based on our analysis:
Therefore, the technique described in the question is Standardisation of work.
| Technique | Primary Aim | Focus Areas |
|---|---|---|
| Method Study | Find the best way to perform a task | Work processes, sequence of operations |
| Time Study | Determine standard time for a task | Timing work elements, setting performance standards |
| Standardisation of Work | Establish standards for uniformity and efficiency | Tools, equipment, materials, methods, working conditions, product types/sizes/characteristics |
| Functional Foremanship | Specialize supervision | Division of supervisory roles based on function |
The aim of reducing a product line to fixed types, sizes, and characteristics directly aligns with the goals of Standardisation of work, which seeks to bring uniformity and predictability to products and processes.
| Technique | Brief Description | ||
|---|---|---|---|
| Standardisation and Simplification of Work | Setting standards for everything; eliminating unnecessary types, sizes, and varieties. | ||
| Method Study | Finding the most efficient way to do a job. | ||
| Time Study | Determining the standard time to complete a task. | Motion Study | Analyzing movements to eliminate inefficient ones. |
| Fatigue Study | Determining the frequency and duration of rest periods. | ||
| Differential Piece Rate System | Wage system linking wages to output and efficiency. | ||
| Functional Foremanship | Specialized supervision by different experts. |
F.W. Taylor emphasized both Standardisation and Simplification as crucial aspects of scientific management. While standardisation focuses on setting fixed norms for quality, size, type, etc., simplification is often seen as a consequence or a part of standardisation.
The question's focus on reducing to "fixed types, sizes, and characteristics" encapsulates a core goal of standardisation, which often involves simplification as part of the process to achieve uniformity and efficiency.
To reduce a given line or product to fixed types, sizes and characteristics is an objective of one of the techniques of Taylor. Identify that technique.
Match List-I with List-II
| List-I | List-II |
|---|---|
| (A) Time study | (I) Amount and frequency of rest intervals to complete a task |
| (B) Motion study | (II) Different wage rate for efficient and inefficient workers |
| (C) Fatigue study | (III) Study of various movements |
| (D) Differential piece wage system | (IV) Determining standard time taken for performing a well-defined job |
Which of the following combination of factors affecting capital structure are correct?
(A) Cost of debt, ROI, flotation costs
(B) Flotation costs, availability of raw material
(C) Level of competition, production cycle
(D) Cost of equity, Interest coverage ratio
(E) Risk consideration, flexibility
Identify the Concept used by Mr. Avinash when he analysed the need for number and type of workers required.
According to functional Foremanship "gang boss" is responsible for