All Exams Test series for 1 year @ ₹349 only
Question

In air-jet loom

The correct answer is
Relay nozzles of a group time

Air-Jet Loom Relay Nozzle Timing

In an air-jet loom, relay nozzles are strategically placed along the weft insertion channel. They work sequentially to assist the main nozzle, ensuring the weft yarn is propelled efficiently across the warp shed.

Relay Nozzle Group Operation

The timing of these relay nozzles is organized into groups to optimize weft propulsion:

  • Grouped Activation: Relay nozzles are typically arranged in sets or groups.
  • Synchronized Timing: Nozzles within a particular group initiate their air jetting function during a shared, specific time interval.
  • Sequential Support: As the weft yarn progresses, different groups of relay nozzles activate in a controlled sequence.
  • Purpose: This grouped and sequential timing provides continuous air assistance, maintaining yarn speed and stability throughout the insertion process.

Evaluating Timing Options

Considering the operational mechanics:

  • Simultaneous activation by all relay nozzles (Option 1) is inefficient and impractical for sustained propulsion.
  • Assigning a unique, separate jetting time to each individual relay nozzle (Option 2) would create unnecessary complexity.
  • While the main nozzle and relay nozzles have distinct roles (Option 4), the specific timing characteristic of the relay nozzles themselves is based on grouping.
  • Conclusion: The effective operation relies on relay nozzles functioning in timed groups, ensuring consistent support for the weft yarn.
Was this answer helpful?

Important Questions from FABR Shuttle Looms and Shuttleless Looms

  1. Profile reed is used in
  2. In a projectile weaving machine, the projectile travels through the shed at an average speed of $24$ m/s taking $2/3^{rd}$ of the loom cycle. If the efficiency of the weaving machine is $90\%$, the weft insertion rate (m/min) is (answer in integer) _________
  3. Match the looms listed in Group I with the corresponding components given in Group II. The correct option is
    Group IGroup II
    P. Multiphase1. Matched cam
    Q. Projectile2. Profile reed
    R. Air-jet3. Crank shaft
    S. Shuttle4. Weaving rotor
  4. In a loom, seven-wheel take-up motion is
  5. A shuttle loom having 1.75 m reed width is running at 180 rpm. The shuttle enters and leaves the shed at $120^\circ$ and $240^\circ$ angular positions of crankshaft, respectively. If length of the shuttle is 0.25 m, then the mean velocity (in m/s) of the shuttle within the shed is________.

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App