I. Merge individual plans with other plans for coordination.
II. Determine time sequence.
III. List all items to be included.
IV. Set down as accurate an estimate of time for each task.
V. Bring total estimated time needed and total available time into harmony.
VI. Write out plan.
Codes :
To create an effective time plan, steps must be followed in a logical order. The correct sequence ensures all aspects are considered, from initial listing to final adjustment.
Begin by identifying and listing every task or item that needs to be part of the time plan. This forms the basis of the plan.
Once items are listed, determine the logical order in which they should be performed or addressed. This establishes the workflow.
For each task in the determined sequence, estimate the time required as accurately as possible. This is crucial for realistic scheduling.
If the plan involves multiple individuals or components, merge the individual plans and ensure coordination among them. This prevents conflicts and ensures synergy.
Document the entire plan, including the sequence, task estimates, and coordination points, in a clear and written format.
Finally, compare the total estimated time with the total available time. Make necessary adjustments to the plan to ensure it fits within the available timeframe.
The proper sequence for making time plans is: III, II, IV, I, VI, V.
| List – I | List – II |
|---|---|
| (a) Objectives | (i) Reveal priorities |
| (b) Strategies | (ii) Retreats |
| (c) Policies | (iii) Potential actions |
| (d) Periodical conduct of strategic management meeting | (iv) Mainly address repetitive/recurring situations |