All Exams Test series for 1 year @ ₹349 only
Question

Work zone in residential building consists of : 

(A) Kitchen 

(B) Drawing Room 

(C) Laundry Area 

(D) Lawn 

(E) Kid's Room 

Choose the correct answer from the options given below :

The correct answer is
(A) and (C) Only

Identifying Work Zones in Residential Buildings

A "work zone" in a residential building refers to an area designated for specific functional tasks and chores. These are typically spaces where activities like cooking, cleaning, or maintenance occur.

Analysis of Options

  • (A) Kitchen: This is a primary area for food preparation and cooking, making it a core work zone.
  • (B) Drawing Room: This space is generally used for guests and relaxation, not typically considered a work zone.
  • (C) Laundry Area: This area is dedicated to washing and drying clothes, functioning as a specific work zone.
  • (D) Lawn: This is an outdoor space, not an internal work zone within the building structure.
  • (E) Kid's Room: While children have activities here, it's primarily a personal space, not a general functional work zone like a kitchen or laundry.

Conclusion on Work Zones

Based on the definition, the Kitchen (A) and the Laundry Area (C) are the most appropriate choices for work zones within a residential building among the given options.

Therefore, the correct combination is (A) and (C).

Was this answer helpful?

Important Questions from Design and Analysis

  1. Which of the following UML diagrams has a static view ?

  2. Match the following in Software Engineering:

    List – I

    List – II

    (a)

    Product Complexity

    (i)

    Software Requirements Definition

    (b)

    Structured System Analysis

    (ii)

    Software Design

    (c)

    Coupling and Cohesion

    (iii)

    Validation Technique

    (d)

    Symbolic Execution

    (iv)

    Software Cost Estimation

  3. Software validation mainly checks for inconsistencies between

  4. Which of the following statements is/are TRUE?

    P: In software engineering, defects that are discovered earlier are more expensive to fix

    Q: A software design is said to be a good design, if the components are strongly cohesive and weakly coupled

    Select the correct answer from the options given below:

  5. Which of the following are the primary objectives of risk monitoring in software project tracking?

    P: To assess whether predicted risks do, in fact, occur
    Q: To ensure that risk aversion steps defined for the risk are being properly applied
    R: To collect information that can be used for future risk analysis

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App