All Exams Test series for 1 year @ ₹349 only
Question

Avoid 'V' neck lines for persons with

The correct answer is
Long and thin neck

V Neckline Styling Principles

The goal of neckline selection is often to create balance and enhance the wearer's features. Different necklines have distinct visual effects.

V Neckline Effects

  • Elongation: A V neckline draws the eye vertically, creating an illusion of length.
  • Focus: It directs attention downwards towards the chest area.

Neckline Avoidance Reasoning

For individuals with a long and thin neck, the elongating effect of a V neckline can emphasize the neck's length and perceived thinness, potentially creating an unbalanced appearance. This neckline might make the neck look even longer and more slender than desired.

Conversely, V necklines can be beneficial for those with shorter necks (creating an illusion of length) or heavier necks (breaking up the width and adding a vertical line).

Conclusion on V Necks

Therefore, V necklines are typically advised against for individuals with long and thin necks to maintain better visual proportion.

Was this answer helpful?

Important Questions from Design and Analysis

  1. Which of the following UML diagrams has a static view ?

  2. Match the following in Software Engineering:

    List – I

    List – II

    (a)

    Product Complexity

    (i)

    Software Requirements Definition

    (b)

    Structured System Analysis

    (ii)

    Software Design

    (c)

    Coupling and Cohesion

    (iii)

    Validation Technique

    (d)

    Symbolic Execution

    (iv)

    Software Cost Estimation

  3. Software validation mainly checks for inconsistencies between

  4. Which of the following statements is/are TRUE?

    P: In software engineering, defects that are discovered earlier are more expensive to fix

    Q: A software design is said to be a good design, if the components are strongly cohesive and weakly coupled

    Select the correct answer from the options given below:

  5. Which of the following are the primary objectives of risk monitoring in software project tracking?

    P: To assess whether predicted risks do, in fact, occur
    Q: To ensure that risk aversion steps defined for the risk are being properly applied
    R: To collect information that can be used for future risk analysis

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App