Question

Which one of the hydel power plants of Telangana is NOT correctly matched with its production capacity?

The correct answer is

Paleru : 56 MW

Hydel Power Plant Capacities in Telangana

Telangana is focused on expanding its energy sector, with hydel power contributing significantly. It is important to accurately associate the names of Telangana's hydel power plants with their specific generation capacities.

Matching Telangana Hydel Power Plants

We will evaluate each option to identify the hydel power plant that is NOT correctly matched with its production capacity:

  • Pulichintala Hydel Power Plant: This plant has a confirmed installed capacity of 120 MW, achieved through four turbines, each rated at 30 MW. Therefore, the match 'Pulichintala : 120 MW' is accurate.
  • Pochampad Hydel Power Plant: Also known as the Sri Ram Sagar Project (SRSP) hydel facility, its total capacity is 36 MW, comprising four units each producing 9 MW. The pairing 'Pochampad : 36 MW' is a correct match.
  • Priyadarshini Hydel Power Plant: This usually refers to the Priyadarshini Jurala Hydro Electric Project. Its installed capacity stands at approximately 231 MW (from 8 units of about 28.875 MW each). The option stating 234 MW is considered a correct match in this context, potentially due to rounding.
  • Paleru Hydel Power Plant: Paleru is recognized primarily for its irrigation reservoir. It is not associated with a major hydel power project with a capacity of 56 MW. This particular pairing represents an incorrect match.

Hydel Power Plant Capacity Summary

The table below provides a summary comparing the capacities listed in the options with the actual or commonly recognized capacities:

Hydel Power Plant Option Capacity Actual/Associated Capacity Match Status
Pulichintala 120 MW 120 MW Correct
Pochampad 36 MW 36 MW Correct
Priyadarshini (Jurala) 234 MW Approx. 231 MW Correct (Approximate)
Paleru 56 MW Not Known for 56 MW Hydel Capacity Incorrect

Therefore, the option 'Paleru : 56 MW' presents the incorrect match.

Was this answer helpful?

Important Questions from Rivers and Water Resources

  1. The "Chambal" is the tributary of which river?

  2. Balaghat District gets irrigation facility from the canal of which river?
  3. Which of the following pair is not correctly matched?

    Irrigation Project

    River/ Tributary

    (A)

    Ban Sagar Project

    Son

    (B)

    Tawa Project

    Tawa

    (C)

    Pench Project

    Pench

    (D)

    Kolar Project

    Betwa

  4. Which one of the following supplements the drinking water needs of Chennai?

  5. Which of the following is called the Ganga of South India?