Creep

Understanding Concrete Creep

The question asks for the term used to describe the long-term deformation of concrete when subjected to a constant load over time. This phenomenon is a key characteristic of concrete behavior.

Analyzing Deformation Factors

  • Creep: This is the time-dependent increase in strain (deformation) that occurs under a constant sustained stress. It's a primary factor in long-term deformation of concrete structures.
  • Shrinkage: This refers to the reduction in volume or dimension of concrete due to moisture loss or chemical changes. While it occurs over time, it is not directly caused by sustained loading.
  • Modulus of rupture: This is a measure of the maximum tensile stress that concrete can withstand before fracturing in a bending test. It represents a static strength property, not long-term deformation.
  • Split tensile strength: This measures the ultimate tensile strength of concrete when subjected to a diametral load. Like the modulus of rupture, it's a static strength characteristic.

Identifying the Correct Term

Based on the definitions, creep is the specific phenomenon related to the gradual increase in deformation under sustained loading over an extended period. Therefore, creep is utilized to determine the long-term deformation of concrete under such conditions.

Was this answer helpful?

Important Questions from Concrete

  1. Water-cement ratio is the ratio of:

  2. Aerated concrete is produced by the addition of:

  3. Two statements associated with concrete are given. Select the correct option with regard to these statements.

    1: As the compaction factor increases, slump decreases.

    2: Slump test helps in qualitatively understand the setting time of concrete.

  4. From theory of elasticity, the splitting tensile strength f ct is given by -
    Where P is the maximum applied load, d is the diameter and L is the length of the cylinder.

  5. ______ are the temporary joints left between subsequent concreting operations, their position should be pre - planned before concreting is started.

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App