______ are the temporary joints left between subsequent concreting operations, their position should be pre - planned before concreting is started.
Construction joints
When undertaking large concrete pours, it's often not possible or practical to complete the entire structure in a single continuous operation. There are planned pauses where one section of concrete is poured and allowed to set before the next section is placed. These planned breaks create temporary interfaces between the different pours.
The question asks to identify the type of temporary joints left between subsequent concreting operations that are pre-planned. Let's look at the different types of joints mentioned:
Based on the description of temporary joints left between subsequent concreting operations whose position is pre-planned, the correct term is construction joints. They mark the end of one concrete pour and the beginning of the next.
Water-cement ratio is the ratio of:
Aerated concrete is produced by the addition of:
Two statements associated with concrete are given. Select the correct option with regard to these statements.
1: As the compaction factor increases, slump decreases.
2: Slump test helps in qualitatively understand the setting time of concrete.
From theory of elasticity, the splitting tensile strength f ct is given by -
Where P is the maximum applied load, d is the diameter and L is the length of the cylinder.