(a) Shank
(b) Blade
(c) Butt
(d) Scarf
Choose the correct answer from the options given below:
The needle bar in a sewing machine holds the needle in place. Understanding which parts of the machine needle are designed to interface with the needle bar is crucial.
The specific parts of a machine needle that fit into the needle bar clamp are:
Other parts of the needle do not interact with the needle bar:
Based on the design and function, only the Shank and the Butt (the top end of the shank) are the parts of the machine needle that fit into the needle bar.
Therefore, the correct option includes (a) Shank and (c) Butt.
The essential conditions for price discrimination practice to succeed in a different markets are
A. Firms must have strong interdependence per se
B. Firm must have some control over the price of the product
C. Differentiated products and strong entry restrictions
D. Price elasticity of demand must differ in different markets
E. Markets for the products must be separable
Choose the correct answer from the options given below:
A salesperson who relies on creative methods for selling products and services is called:
Which of the following are the examples of need for status?
(A) Being in a position of authority over others
(B) Having executive privileges
(C) Participating in pleasant social activities
(D) Working for the right company in the right job
(E) Living in the right neighbourhood
Choose the most appropriate answer from the options below:
Marketing feasibility of any idea includes the following aspects :
(a) Current and future demand estimates
(b) Market segmentation and identification of target markets
(c) Competition analysis
(d) Market testing
Which of the following option are correct?
What is the correct sequence of steps involved in the master production schedule preparation?
(A) Obtaining the net requirement of materials
(B) Revising the preliminary master production schedule to accommodate the inadequacy of materials
(C) Obtaining the specification on required production
(D) Assessing the inventory in hand and on order
(E) Determining the gross requirements of materials using MRP
Choose the correct answer from the options given below: