Which of the following consists of keeping a watch on expediting function?

The correct answer is

Flow of material and in case of trouble locate source of trouble

Understanding the Expediting Function in Production Control

The question asks about the core activity involved in keeping a watch on the expediting function. Expediting is a critical part of production planning and control. Its main purpose is to ensure that production orders are completed on time by monitoring progress and taking corrective action when needed. It's like being a watchdog for the production schedule.

Analyzing the Options for Expediting

Let's look at each option and see how it relates to the expediting function:

  • Minimizing the delays: This is a desired outcome or goal of expediting, but not the specific activity of watching or monitoring. Expediting aims to minimize delays by actively managing the process.
  • Making efficient dispatching: Dispatching is the step where production orders are issued and work is authorized. While efficient dispatching is important for smooth operations, expediting happens after dispatching to monitor the execution of those orders. It's a different phase of control.
  • Operator's activity: Expediting involves monitoring the progress of entire jobs or batches, not just the activity of a single operator. While an operator's performance contributes to the overall flow, focusing only on one operator's activity isn't the complete picture of expediting.
  • Flow of material and in case of trouble locate source of trouble: This option describes exactly what expediting does. It involves keeping track of how materials and work-in-progress move through the production process ("flow of material"). When the flow stops or slows down, causing potential delays, the expediter's job is to identify why this is happening ("locate source of trouble"). This troubleshooting aspect is essential for getting the production back on track.

Why Monitoring Flow and Troubleshooting is Key to Expediting

The essence of the expediting function is proactive monitoring and problem-solving. To "keep a watch" on expediting means observing the production process to ensure it's running according to the plan. If it deviates, the expediter investigates the cause of the deviation, which could be missing materials, machine breakdown, labor issues, or other problems. Therefore, tracking the "flow of material" (which represents the progress of work) and being ready to "locate source of trouble" when the flow is interrupted are the primary activities involved in this function.

The activity that consists of keeping a watch on the expediting function is, therefore, focused on monitoring the production flow and identifying and resolving issues that impede it.

Was this answer helpful?

Important Questions from Project Management

  1. Factors which govern the operating cost of an equipment are :

    1. Purchase price of the equipment

    2. Depreciation due to regular use

    3. Cost of operation, maintenance and repairs

    Which of the above statements are correct ? 

  2. In Emerson's efficiency plan of wage incentive system, the bonus is paid to-

  3. Match List I with List II

    LIST I

    (Project Network concepts)

    LIST II

    (Underlying meaning)

    A.Crashing an activityI.Length of the longest path through the project network
    B.Project NetworkII.It shows the time and cost when the activity is fully crashed
    C.Critical pathIII.It consists of a number of nodes and a number of arcs that connects two different nodes
    D.Crash pointIV.Taking special (costly) measures to reduce the duration of an activity below its normal value

    Choose the correct answer from the options given below:

  4. The following statements relate to project network. Choose the correct code for the statements being correct or incorrect.

    Statement I: An activity cannot be represented by more than one arrow, but an arrow can represent one or more activities.

    Statement II : The activities in a critical path can be preponed or postponed.

  5. A public limited company has 9,00,000 shares outstanding at current market price of Rs. 130 per share. The company needs Rs. 2.25 crores to finance its proposed new project. The board of the company has decided to issue rights shares to raise the required money at Rs. 75 per share (as subscription price) to ensure that the rights issue is fully subscribed. How many rights are required to purchase a new share ?

Need Expert Advice?

Start Your Preparation with Prepp Mobile App

Download the app from Google Play & App Store
Download the app from Google Play & App Store
Prepp Mobile App