Spiral model of software development is also known as ______.
meta model
The Spiral model is a software development life cycle (SDLC) model known for its iterative and risk-driven approach. It combines elements of the Waterfall model and iterative prototyping, making it suitable for complex, large, or high-risk projects.
Each cycle of the spiral involves four key phases:
The process continues spiraling outward until the final product is built. The radius of the spiral typically represents cost, and the angular dimension represents progress through the four phases.
While the term 'meta model' isn't the most common alternative name for the Spiral model (which is often referred to as a 'risk-driven model' due to its emphasis on risk analysis), the term 'meta model' could be applied because the Spiral model can be seen as a framework or structure that encompasses or integrates other development models and approaches. It provides a guiding structure (the spiral cycle with its phases) within which different methods (like waterfall for parts of engineering, or prototyping for risk resolution) can be used. In this sense, it's a model *about* how to combine different development strategies, thus acting as a 'meta' layer or model.
Based on the provided options and the interpretation that the Spiral model can integrate various development strategies, 'meta model' is presented as an alternative name.
| Phase | Key Activities |
|---|---|
| Planning | Define objectives, constraints, iteration goals. |
| Risk Analysis | Identify, analyze, mitigate risks. |
| Engineering | Design, code, test, build the product increment. |
| Evaluation | Customer review, planning for next iteration. |
| Concept | Description |
|---|---|
| Nature | Iterative and Evolutionary |
| Key Feature | Emphasis on Risk Management |
| Phases | Planning, Risk Analysis, Engineering, Evaluation |
| Suitable For | Large, complex, high-risk projects |
Software Development Life Cycle (SDLC) models provide a framework for planning, creating, testing, and deploying an information system. Besides the Spiral model, other popular SDLC models include:
Choosing the right SDLC model depends on project requirements, size, complexity, risk tolerance, and team structure.
Which statement(s) is/are false?
P: The Cleanroom software-engineering methodology for high reliability uses incremental software development.
Q: Clean-room reimplementation, with implementers separated from the original source code, is a technique for reducing unconscious copying of that code.
Choose the correct answer from the code given below.
Assume that the software team defines a project risk with 80% probability of occurrence of risk in the following manner :
Only 70 percent of the software components scheduled for reuse will be integrated into the application and the remaining functionality will have to be custom developed. If 60 reusable components were planned with average component size as 100 LOC and software engineering cost for each LOC as \(\$\) 14, then the risk exposure would be
Identify the correct statements from the following regarding spiral model.
A. Spiral model is an incremental process model.
B. Spiral model is a risk - driven process mode.
C. Spiral model is an acyclic balancing approach.
D. Spiral model involves a set of anchor point milestone.
Choose the correct answer from the options given below:
___________ model couples the iterative nature of the prototyping with the controlled and systematic aspects of the linear sequential model.