Question

Match the LIST-I with LIST-II
LIST-ILIST-II
A. Class diagramI. subset
B. Package diagramII. relationship
C. Object diagramIII. dependencies
D. Component diagramIV. static structure
Choose the correct answer from the options given below:

The correct answer is
A-IV, B-I, C-II, D-III

Matching UML Diagrams with Concepts

This question requires matching different types of UML diagrams (LIST-I) with their primary concepts (LIST-II).

Analysis of Matches:

  • A. Class diagram: Primarily used to model the static structure of a system, showing classes, attributes, and relationships. Matches IV. static structure.
  • B. Package diagram: Organizes elements into logical groups called packages. A package represents a subset of model elements and shows dependencies between these groups. Matches I. subset.
  • C. Object diagram: Depicts instances of classes and their relationships at a specific point in time, serving as a snapshot. Matches II. relationship.
  • D. Component diagram: Illustrates the organization and dependencies among software components. Matches III. dependencies.

Correct Matching:

Based on the analysis, the correct matches are:

  • A - IV
  • B - I
  • C - II
  • D - III

This corresponds to option C.

Was this answer helpful?

Important Questions from Design and Analysis

  1. Which of the following UML diagrams has a static view ?

  2. Match the following in Software Engineering:

    List – I

    List – II

    (a)

    Product Complexity

    (i)

    Software Requirements Definition

    (b)

    Structured System Analysis

    (ii)

    Software Design

    (c)

    Coupling and Cohesion

    (iii)

    Validation Technique

    (d)

    Symbolic Execution

    (iv)

    Software Cost Estimation

  3. Software validation mainly checks for inconsistencies between

  4. Which of the following statements is/are TRUE?

    P: In software engineering, defects that are discovered earlier are more expensive to fix

    Q: A software design is said to be a good design, if the components are strongly cohesive and weakly coupled

    Select the correct answer from the options given below:

  5. Which of the following are the primary objectives of risk monitoring in software project tracking?

    P: To assess whether predicted risks do, in fact, occur
    Q: To ensure that risk aversion steps defined for the risk are being properly applied
    R: To collect information that can be used for future risk analysis