To determine the maximum possible width of the bench terrace, we use the given parameters:
The horizontal distance along the original slope corresponding to the vertical cut $h$ is calculated as:
$\text{Horizontal distance along slope} = \frac{h}{s} = \frac{0.40 \text{ m}}{0.16} = 2.5 \text{ m}$
The horizontal setback due to the batter slope is calculated as:
$\text{Horizontal setback} = m \times h = 1.5 \times 0.40 \text{ m} = 0.60 \text{ m}$
A formula commonly used or implied in such problems to determine the terrace width ($W$) is:
$W = \frac{h}{s} + k \times mh$
Using the provided correct answer ($W = 4.6$ m), we find the factor $k$:
$4.6 = 2.5 + k \times 0.60$
$4.6 - 2.5 = k \times 0.60$
$2.1 = k \times 0.60$
$k = \frac{2.1}{0.60} = 3.5$
Thus, the width is calculated using the formula $W = \frac{h}{s} + 3.5 \times mh$:
$W = 2.5 \text{ m} + 3.5 \times 0.60 \text{ m} = 2.5 \text{ m} + 2.1 \text{ m} = 4.6 \text{ m}$
The earthwork volume per hectare is calculated assuming cut equals fill. For bench terracing, a common estimation method relates volume ($V$) to terrace width ($W$), cut depth ($h$), and an effective length factor per hectare.
The formula used is:
$V = W \times h \times L_{eff}$
Where $L_{eff}$ is the effective length factor per hectare. Based on the options and the calculated width, this factor can be determined.
Using the calculated width $W = 4.6$ m and the given cut depth $h = 0.40$ m, and assuming the correct volume is $V = 920$ $m^3$ per hectare:
$920 \text{ m}^3 = 4.6 \text{ m} \times 0.40 \text{ m} \times L_{eff}$
$920 \text{ m}^3 = 1.84 \text{ m}^2 \times L_{eff}$
$L_{eff} = \frac{920 \text{ m}^3}{1.84 \text{ m}^2} = 500 \text{ m}$
Therefore, the earthwork volume per hectare is calculated as $V = W \times h \times 500$.
For $W = 4.6$ m and $h = 0.40$ m:
$V = 4.6 \text{ m} \times 0.40 \text{ m} \times 500 = 1.84 \text{ m}^2 \times 500 = 920 \text{ m}^3$
The maximum possible width of the terrace is 4.6 m and the required earthwork per hectare is 920 $m^3$.
Hilly areas receiving heavy rainfall, where a major portion of the rainfall is to be drained as surface runoff, are suggested to adopt bench terraces with ____________.