A. Gujarat
B. Rajasthan
C. Maharashtra
D. Tamil Nadu
Choose the correct answer from the options given below:
The question requires arranging four Indian states – Gujarat (A), Rajasthan (B), Maharashtra (C), and Tamil Nadu (D) – based on their total installed solar power capacity in descending order, as of August 2025. This requires referencing recent data or reliable projections for solar power installations in these states.
Based on available industry reports and government data, the approximate installed solar power capacities are:
| State (Code) | Approx. Installed Capacity (GW) |
|---|---|
| Rajasthan (B) | ~18.0 GW |
| Gujarat (A) | ~11.0 GW |
| Maharashtra (C) | ~7.5 GW |
| Tamil Nadu (D) | ~7.0 GW |
Arranging the states in descending order based on the approximate installed solar power capacity:
Therefore, the correct descending order is B, A, C, D.
This corresponds to Option D.
Geothermal power plants are much like fossil and nuclear plants with exception of no requirements of:
A. Vapour dominated hydrothermal resources
B. Boiler
C. Fission reactor
D. Turbine generator
Choose the correct answer from the options given below:
Given below are two statements. One labelled as Assertion (A) and the other labelled as Reason (R) :
Assertion (A) : OTEC power plants have low efficiences.
Reason (R) : Efficiency is governed by 2nd law of thermodynamics.
Choose the correct answer :