A can do a work in 30 days and B can do the same work in 40 days. They work together for 8 days and then B leaves the work. In how many days will A finish the remaining work?
16
- A's 1-day work = 1/30, B's 1-day work = 1/40.
- Together, in 1 day, they complete:
(1/30) + (1/40) = (4/120) + (3/120) = 7/120.
- In 8 days, they complete:
8 × (7/120) = 56/120 = 14/30.
- Remaining work = 1 - 14/30 = 16/30.
- A alone will complete this in (16/30) × 30 = 16 days.
In a circular race on a track of length 2000 m, X and Y start from the same point at the same time in opposite directions at the speeds of 15 km/h and 33 km/h, respectively. After how much time will they meet next?
Which of the following option figures will complete the pattern in the figure given below?

A has completed two-third of a job in 8 days, and B completes the rest of the job in 20 days. In how many days can they together complete the job?
The smallest 4-digit prime number is:
If Anand can do a piece of work in 9 days and Vinod can complete the same work in 6 days, then in how many days will both of them complete it together?