A and B can complete a work together in 9 days. If A alone can do it in 12 days, then, B alone can do one-third of the same work in __________days.
12
A + B together finish the work in 9 days, so their combined one-day work is 1/9.
A alone finishes it in 12 days, so A’s one-day work is 1/12.
B’s one-day work = 1/9 − 1/12 = (4 − 3)/36 = 1/36. So B alone finishes the full work in 36 days.
One-third of the work takes B 36/3 = 12 days.
Hence, 12.
A can lay railway track between two given stations in 17 days and B can do the same job in 16 days. With the help of C, they did the job in 4 days only. Then, C alone can do the job in __________